Laserfiche WebLink
\J <br />• <br /> <br />TR 00-35 Techincal Revision to the Operation of the Fish Creek Borehole Treament Faciltiy <br />Reclamation Costs <br />Road Realignment (250'), Minor Changes Total 300', and Truck Turnaround (200') <br />Ripping - .256 acre @ 2' deep = 833 BCY/1,238.76 BCY/hr = _ <br />0.67 hrs @ $65.88 <br />Final Grading - 750' x 15' @ 2' = 967 LCY/228.99 LCY/hr = _ <br />4.22 @ $62.60/hr <br />Topsoil Replacement - 750' x15' @ 2' = 1,041.67 LCY/180.73 LCY/hr = _ <br />5.76 @ $62.60/hr <br />Subtotal = <br />Power Poles <br />Approximately 1,000 If wood and wire @ $1.88/lf <br />Temporary Storage Structure <br />Structure 30' x 8' x 8' = 1,920 d @ $.18/d <br />Remote Monitoring Equipment <br />Equipment Removal and Conduit (2 x 50') - 100' @ $4.72/If <br />Total = <br />$ 44.27 <br />$ 264.26 <br />$ 360.81 <br />$ 669.34 <br />$ 1,680.00 <br />$ 345.60 <br />$ 472.00 <br />$ 3,366.94 <br />APPROVED APR 1 4 2000 <br />7R 00-35 <br />87 <br />03/28/OD <br />