My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42558
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:45:00 PM
Creation date
11/20/2007 11:13:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000041
IBM Index Class Name
Permit File
Doc Date
3/13/2000
Doc Name
CONSTRUCTION MATERIALS REGULAR 112 OPERATION RECLAMATION PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6 <br />,~8. It is a provision of this permit that the operations will be conducted in accordance with the terms and <br />conditions listed in your apphcation, as well as with the provisions of the Act and the Construction Material <br />Rules and Regulations in effect at the time the permit is issued. <br />9. Annually, on the anniversary date of permit issuance, you must submit an annual fee as specified by <br />Statute, and an annual report which includes a reap describing the acreage affected and the acreage <br />reclaimed to date (if there aze changes from the previous yeaz), any monitoring required by the Reclamation <br />Plan to be submitted annually on the anniversary date of the permit approval. Annual fees aze for the <br />previous yeaz a permit is held. For example, a permit with the anniversary date of July 1, 1995, the annual <br />fee is for the period of July 1, 1994 through June 30, 1995. Failure to submit your annual fee and report by <br />the permit anniversary date may result in a civil penalty, revocation of your permit, and forfeiture of your <br />financial warranty. It is your responsibility, as the permittee, to continue to pay your annual fee to the <br />Office until the Board releases you from your total reclamation responsibility. <br />10. For~oint venture/partnership operators: the signing representative is authorized to sign this document <br />and a power of attorney (provided by the partner(s)) authoriIIng the signature of the representative is <br />attached to this application. <br />NOTE TO COMMENTORSlOBJECTORS: <br />It is likely there will be additions, changes, and deletions to this document prior to Snal decision by the Office. <br />Therefore, if you have any comments or concerns you must contact the applicant or the Office prior to the <br />decision date so that you will know what changes may have been made to the application document. <br />The Office is not allowed to consider comments, unless they aze written, and received prior to the end of the <br />public comment period. You should contact the applicant for the Snal date of the public comment period. <br />If you have questions about the Mined Land Reclamation Boazd and Office's review and decision or appeals <br />process, you may contact the Office at (303) 866-3567. <br />
The URL can be used to link to this page
Your browser does not support the video tag.