Laserfiche WebLink
• YOAST/SENECA PROJECT <br />AMENDMENT 1 <br />"EXH181T E" <br />Total surface area to be graded and reseeded. <br />9 drill pads 50' x SO' = 0.5 acres <br />Estimated Costs <br />1. Regra de drill pads <br />1.5 hours per pad x 9 pads = 13.5 hours <br />Back-fill mud pits <br />2 hours per pit x 6 pits = 12.0 hours <br />Total hours = 25.5 x $50/hour = $1,275.00 <br />2. Reseed drill pads <br />• .5 total acres x $250/acre = $125.00 <br />3. Sealing wells with bentoni to slurry <br />Drill rig and water truck used to abandon wells <br />4,850 feet to be abandoned <br />4 bags be ntonite per 100 feet of 4 inch well <br />194 bags bentoni to x $7.50/bag = $1,455.00 <br />Equipment and Labor - 1 hour per shallow well = 3 hours <br />6 hours per deep well = 36 hours <br />Total hours = 39 x $75.00/hour = $2,925.00 <br />4. Surface sealing (cement plug at top) <br />$30/hole x 9 = $270.00 <br />5. Summary - 1 <br />2 <br />3 <br />4 <br />iota) Bond Rider <br />Regrading Costs = $1,275.00 <br />Reseeding Costs = $ 125.00 <br />Well Abandonment = $4,380.00 <br />Surface Sealing = $ 270.00 <br />$6,OSO.DO <br />