Laserfiche WebLink
Page 4 of 4 • • <br />• Install 3" (minimum depth) topsoil <br />• Install seed in accordance with seed plan. <br />f) I) Final grading to be performed by using conventional earthwork <br />equipment such as dozers, motor-graders, loaders, and <br />excavators. Maximum slope gradient is to be 3H to 1V. <br />ii) Please see section 2(d) for complete see blend. Seeding will be <br />performed using the drill method. <br />iii) No fertilizer required per Steve Russell of the Natural Resource <br />Conservation Service in Monte Vista, Colorado. <br />iv) No trees or shrubs will be planted. <br />v) Topsoil will be a minimum of three (3) inches. <br />