Laserfiche WebLink
<br />'~ <br /> <br />Table 2 <br />Estimated Reclamation Casts <br />Pit t3a. 4 <br />Backfilling and gradingl 250,000 cu.yd. .@ $0.54/cu.yd. $135,000 <br />Ibpsoil redistribution) 95,100 cu.yd. @ 0.74/cu.yd. 33,374 <br />Suing crosts2 136.8 acres @ $325/acre 44,460 <br />Pinching costs2 136.3 acres @ $143/acre 19,562 <br />Fertilizing costs 136.3 acres @ $100/acre 13,680 <br />t-]aintenance 136.8 acres @ $ 50Jacre 6,840 <br />Pit hb. 5 <br />Aackfilling and grading 70,000 cu.yd. @ $0.54/cRa.yd. $ 37,300 <br />4bpsoil redistribution 4,770 cu.yd, @ 0.74/cu.yd. 3,530 <br />Seeding costs 22,3 acres @ $325/acre 7,248 <br />Mulching costs 22.3 acres @ 5143/acre 3,139 <br />Fertilizing costs 22.3 acres @ $100/acre 2,230 <br />Maintenance 22.3 acres @ $ 50/acre 1,115 <br />Pit :b. 6 <br />Backfillinq and grading 10,100 cu.yd. @ $0.54/cu.yd. $ 5,454 <br />7bosoil redistribution 3,770 cu.yd. @ 0.74/cu.yd. 2,790 <br />Seeding costs 10.G acres @ $325/acre 3,445 <br />hLilctting costs 10.6 acres @ $143/acre 1,516 <br />Fertilizing costs 10.6 acres @ $100/acre 1,060 <br />Maintenance 10.6 acres @ S 50/acre 530 <br />1~`dscellaneous <br />Dismantling and re~nval of office, fuel tanks, te<mzorasy shoo, etc. <br />ZC7I'AL ESTLNA'PE <br />.btes: <br />)Actual Operating costs data at this mine <br />2Taken from 1980 Dod4e Guide <br />2-85 <br />N-4 <br />$ 10,000 <br />$362,328 <br />