My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1984-08-20_PERMIT FILE - M1984099
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1984099
>
1984-08-20_PERMIT FILE - M1984099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2022 1:53:49 PM
Creation date
11/20/2007 11:09:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984099
IBM Index Class Name
Permit File
Doc Date
8/20/1984
Doc Name
J BAR B INC BAILEY PIT FN M-84-099
From
ENVIRONMENT INC
To
MLRD
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.... • i <br />EXHIBITL (rev 8/84) <br />RECLAMATION COSTS <br />The point of greatest disturbance in the operation is expected <br />to be near the time of completion of Stage 1 before it is necessary <br />to move the plant site south of the creek. The plant site contains <br />about 15 acres that will need only resoiling and revegetation. <br />The plant will probably be located on the northeast side of <br />Stage 1 approximately in the area that will become Lake 3 after <br />the plant is moved. Therefore, there will be approximately <br />77 acres of disturbed land of which 56 acres will be reclaimed <br />by water. Thus, 21+/- acres will require grading and shaping, <br />the respreading of soils, and revegetation. This 21+/- acres <br />plus the 15+/- acres in the floating plant site total 36+/- <br />acres. <br />The following reclamation costs are based on approximately <br />92 acres as being the maximum disturbed at any given period <br />during the life of the mine. <br />Financial warranty will be supplied to the Board under <br />34-32-117(3)(a)(I) C.R.S. 1983 Rev. <br />Reclamation Items, Onit Cost <br />Grading and shaping - 6 hrs/acre @ $80.00/hr <br />Respreading soil <br />(1 acre x 43560 x 1 ft)/27=1614 yds/ac x $0.56/yd <br />Grass Seed Mix - 17.5#/ac @ $1.96 <br />Fertilizer - 200# @ $16/100# <br />(assumed high; actual will depend on soil analysis) <br />Seed drilling and fertilizing - 1.5 hrs/ac @ $45/hr <br />Labor, other, 16 man hrs/ac @ $6.50/hr <br />Trees and shrubs, 500 bareroot @ $24.00/100 = 120/60 <br />180 potted @ $19.00/30 = 114/60 <br />300 3/4 to 1 inch @ $50/ea.=15000/60 <br />Other - $1500/60 <br />Reclamation Costs (per acre) <br />Estimate of Reclamation Costs <br />Grade and shape - 36 acres @ $480/acre <br />Backfilling - 1,000 lft x 15cy/lft x $0.30/cy <br />Respread soil and smooth - 36 acres @ $903.84/acre <br />Grass seed - 36 acres @ $34.30/acre <br />Fertilizer - 36 acres @ $32.00/acre <br />Drill and spread - 36 acres @ $67.50/acre <br />Labor, tree planting and general - 36 ac. @ $104/ac. <br />Trees and shrubs - 36 acres @ $279/acre <br />Total Reclamation Costs <br />480.00 <br />903.84 <br />34.30 <br />32.00 <br />67.50 <br />104.00 <br />2.00 <br />2.00 <br />250.00 <br />1,900.64 <br />$ 17,280.00 <br />4,500.00 <br />32,538.24 <br />1,234.00 <br />1,152.00 <br />2,430.00 <br />3,744.00 <br />$ 72,922.24 <br />SUGGEST BOND BE SET AT $73,000. <br />
The URL can be used to link to this page
Your browser does not support the video tag.