My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42363
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:51 PM
Creation date
11/20/2007 11:06:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999007
IBM Index Class Name
Permit File
Doc Date
4/7/1999
Doc Name
ACE WEST TRUCKING INC FN M-99-007 NORTH RIVER GRAVEL PIT EXTENSION
From
DMG
To
JOY SURVEYING CO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~TAT~ ,~OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Departmem of Natural Resources <br />171 S Sherman 51.. Room ? I S <br />DIVISION OF <br />Denver, Colorado 80203 <br />Fnnne: 13031 aae-3567 MINERAL S <br />FAX: 13011 A32~6106 $i <br />GEOLOGY <br />RECLAMATION <br />MINING•SAFETY <br /> Bill pwens <br />April 7, 1999 envernor <br /> Greg E. Walther <br /> Evecurive D~ceaor <br />Nir. James Joy M;chael B. Long <br />JOy Surveying CO. Drvivon Director <br />Box l I ~3 <br />Meeker• Colorado 81641 <br />RE: Ace West Trucking Inc., File No. M-99-007 <br />North River Gravel Pit Extension <br />Deaz Mr. Joy, <br />The Division received your adequacy response faxed to our Office on April 6, 1999. The applicant must <br />address one additional concern before the North River Gravel Pit Extension can be approved. <br />The applicant identified BLM as the owner of land directly north of the proposed pit. As stated in the <br />Division's letter dated March 26, 1999, surface owners within 200 feet of the boundary of the affected <br />land must be notified of the proposed operation (Rule 1.6.2(1)(e). The applicant will need to notify the <br />BLM of the proposed operation and obtain a written waiver of their right to the 10-day comment period. <br />If the applicant is unable to obtain the written waiver, the decision due date will need to be extended an <br />additional 10 days from the date the BLM received the notice to allow for comments. A copy of the <br />signed, certified mail return receipt or a letter from the BLM is acceptable. <br />If you have any questions, please do not hesitate to call. <br />Sincerely, <br />~~~ ~~~ <br />Erica Crosby <br />Environmental Protection Specialist <br />cc: Don Rooks; Ace West Trucking, lnc. <br />Carl lvlounr DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.