My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42263
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42263
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:46 PM
Creation date
11/20/2007 11:04:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020
IBM Index Class Name
Permit File
Doc Date
1/20/2004
Section_Exhibit Name
Appendix M(i) to M(v) Hydrologic Data
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. OFFSITE DRAINAGE CONTRIBUTION <br />Most of the off site drainage does not affect the developed •rea. <br />The runoff will be passed through the site as historic flow. The water- <br />sheds have been located on the Drainage Aspects drawing to Include any <br />runoff that will flow into the site. Therefore the peak runoff rate re- <br />fleets the entire drainage area, The culverts are sued to convey the <br />water under tfie access road and drain into Munger Creek. <br />IV. SITE DRAINAGE <br />A. Watersheds A and B <br />Watershed B Is the furthest upstream and is above the mine site. <br />Watershed A will combine with B's runoff before passing under the road. <br />Therefore, calculations have been shown for the combination of A and <br />B, as wail as sizing of a culvert for the two watersheds. Also, each <br />watershed has been calculated separately should the mine site (A) need <br />. to be considered independently from watershed B. <br />B. Watersheds C, D and E <br />These have been considered separately since each one will drain <br />independently into the tributary from watersheds A and B then into Munger <br />Creek. Calculations of runoff and culverts are in Drainage Calculations. <br />C. Watersheds F and X <br />Watersheds F and X have been combined since watershed X will <br />contribute to watershed F before crossing access road. Also each water- <br />shed has been calculated separately should the need arise that the runoff <br />from each watershed be required. <br /> <br />_~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.