Laserfiche WebLink
w.o. 2937 <br />SHERIDAN ENTERPRISES - LOMA LOAL PROJECT <br />DRAINAGE CALCULATIONS <br />Starting at the uppermost pipe <br />Basin Lontributory to 48" 0 Pipe <br />Area - 68.9 AC. <br />Time of Concentration - Nomograph <br />H - 6900-5700 - 1200 <br />L - 3500 <br />Tc - 6.5 Mln. <br />t - 0.4 In./H r. <br />Q - CiA - (0.4)(0.4)(68.9) - 11.0 cfs <br />Capacity of 48" 0 CMP. <br />Q = .0^061 s} D8/3 = 77 cfs <br />where n - .024 <br />s = .O1 (assumed) <br />Basin Contributory to first 18" 0 Pipe <br />Area - 35.6 AC. <br />Time of Concentration - Nomograph <br />H 6525-5680 = 845 <br />L - 2500 <br />Tc - 5 Min. <br />i - 0.4 In./Hr. <br />Q - CiA - (0.4)(0.4)(35.6) = 5.7 cfs <br />Capacity of 18" 8 <br />Q - .0^061 s} D8/3 - 5.7 efs ' <br />Basin Lontributory to second 18" 0 Pipe <br />Area - 3.7 AC. 18" 0 has adequate capacity. <br />Basin Contributory to third 18" 0 Pipe <br />Area - 22.7 AC <br />Tc = 60 Min. <br />i - 0.8 In./H r. <br />Q - CTA = (0.4)(0.8)(22.7) 7.2 cfs 18" 0 pipe has adequate capacity. <br />-.~(- <br />