My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42253
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42253
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:46 PM
Creation date
11/20/2007 11:04:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
Permit File
Doc Date
9/9/1997
Doc Name
FN M-97-054 AGILE STONE SYSTEMS INC PARKDALE PROJECT ADEQUACY LETTER
From
DMG
To
AGILE STONE SYSTEMS INC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.. ,• <br />2. What is your legal right to enter the existing railroad right-of-way to connect your permit <br />area rail lines to the existing rail line? Also provide your legal right to enter the powerline <br />right-of-way (if one exists) to conduct any mining activity that disturbs the land. <br />EXHIBIT 0 -Owner(s) of Record of Affected Land (Surface Areal and Owners of Substance <br />to be Mined <br />List all owners of surface rights-of-way in areas to be affected by mining activities and <br />within 200 feet of such lands, including the owner of the railroad right-of-way. <br />EXHIBIT S -Permanent Man-Made Structures <br />Provide a notazized agreements between Agile Stone Systems and persons having legal <br />interest in the powerline and the railroad that Agile Stone Systems will provide <br />compensation for any damage to these structures. <br />-or- <br />If such agreements aze not reached, provide appropriate engineering evaluations <br />demonstrating that these structures will not be damaged by activities occurring at the mining <br />operation. <br />Geoteclinical Stability Ezhibit <br />Please refer to Mr. James Dillie's memo to me dated July 31, 1997 (copy attached), and <br />provide the information he needs to evaluate the stability of the quarry highwalls. <br />M.bSS~PMM\TEMPADQCY LDO <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.