Laserfiche WebLink
\ • TJtItT 1 <br />r~r,• 7 ,~r 13 <br />rcmm N,.. c0-006981 <br />B. SCII[•:UULE 0[ CO~UI'.LIAtiCE <br />1. 7'hc pcrmiltrc s~iall arliirvc comf•liancc with the eCClucnt limitations spcciticd for <br />discharges in accordance vril,li tlic followins schedule: <br />The permitter shall submit to the permit issuing authority in less than <br />ninety (90) days after the issuance of this permit, an implementation <br />plan for an abztement program designed to achieve the effluent lirnitatiors <br />Specified in this o!rmit for discharge from outfall(s) 001,002 and 003 <br />The implementation plan shall consist of an outline of intended design, <br />construction anti operation, including a compliance schedule setting <br />forth the dates by ~:rliich compliance with the effluent limitations ::ill <br />be reached. The corpliance schedule shall include, where a;,propri~te, <br />dates to accomplish the follol•ring: <br />a) completion of preliminary plans <br />b) completion of final plans <br />c) avrard of contract(s) <br />d) commencenierit of construction <br />e) completion of major construction phases <br />f) completion of all construction <br />g) attainment of operational level by July I, 1977 <br />Upon approval of the implementation plan by the permit issuing authority, <br />the schedule of co-~pliance shall become conditions of this permit. <br />2. No later than 14 calendar days Collotving a date identified in the above schedule oC <br />compliance, the permitter. shall submit either a report of progres., or, in the case oC <br />6pCClflr actions being inquired by identified dates, a «Titten notice of compliance or <br />noncompliance. [n the laltrr case, the notice steal include the cause oC noncompliance, <br />any remedial actions taken, and the probability oC meeting the nest scheduled <br />requirement. <br />