Laserfiche WebLink
4.14.6 Regrading or Stabilizing Rills and Gullies <br />To provide for the regrading and stabilization of any rills and gullies, the following plan will be used. <br />• 1. The reclaimed area will be inspected concurrently with the pond inspection. Areas showing <br />evidence of rill and gully formation will be recorded and mapped for inventory purposes. A report of <br />the inspection results will be kept on file per Rule 5.02.4 <br />2. The mapped areas will be repaired using materials on site for fill. This work will be performed in <br />the fall, (September to November) depending on weather conditions. The repaired areas will be hand <br />seeded with the approve seed mix. <br />3. To prevent future development of rills and /or gullies, velocity dissipaters may be installed at the <br />beginning and along the erosion path as required. Examples of energy dissipaters are straw bales held <br />in place with rebar and vegetation clumps, i.e., grass or small shrubs. If vegetation clumps aze used the <br />disturbed areas will be leveled by hand and seeded with the approved mix. Vegetation masses will be <br />taken from within the permit area using hand methods.. Maintenance work will be included in the <br />appropriate inspection report. <br /> <br /> <br />Renewal #3 02/08/2000 120 <br />