Laserfiche WebLink
~~ <br />_)_ <br />• <br />b) The Board ~~ill enter the lands to perform reclamation only if the Board has determined: <br />not been performed, and <br />that reclamation required by law to have been performed upon such lands has <br />ii. that perm[ revocation proceedings described in the Ac[ or similar provisions <br />of subsequent laws, if any, have been initiated. <br />c) The Division, acting for the Board, will enter lands to respond [o an emergency only <br />where the Division determines that anv of the conditions of Construction Material Rule 8.4.2 exist. <br />7) The additional conditions set forth in the attached rider, if any, are incorporated herein by <br />reference. <br />/_/ a) Rider is attached. <br />/ XX / b) No rider is attached. <br />MINED LAND RECLAMATION BOARD <br />COLORADO DEPARTMENT OF NATURAL RESOURCES <br />MICHAEL B. LO <br />Division Director <br />A1~\OSS\BfX.1TEt.~N1AP3 W 6~.TA5 <br />