My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42054
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:35 PM
Creation date
11/20/2007 11:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/6/2007
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />• <br />PROJECT IDENTIFICATION <br />Task # : 050 <br />Date : 11/08/2006 <br />User: JRS <br />Permit/jot# : C-1981-012 <br />Abbreviation :none <br />Filename : C012-050 <br /> Agency or organization name :Colorado Division Of Minerals And Geology <br /> Permit or other job action : PaRial Phase 1 Bond Release SL-02 <br /> Task description : Regrade All Ditches at East Portal Area <br /> ,::: <br />.. <br />HOURLY EQUIPMENT COST <br />,: <br />,.: <br /> Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br /> Blade type :Semi-Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br /> Attachment no. 2 :3-shank dpper <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cosUhour : $72.92 NA <br /> Operating cosUhour : $98.84 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $204.53 Total fleet cost/hour : $204.53 <br />• MATERIAL QUANTITIES ~ ~~ ~~ <br /> Initial Swell Loose <br /> volume: 8,744 CCY factor: 1.125 volume: 9,837 LCY <br /> Source of estimated volume :Exhibit 19, pages D-1 - D-9; Table 20; Maps 13, 13A, 14 and 24 <br /> Source of estimated swell factor :CAT Handbook <br /> HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 200 feet <br />Unadjusted hourly production : 700.0 LCY/hr <br />State :Colorado <br />County :Las Animas <br />Site :New Elk Mine <br />Average push gradient <br />Average site altitude <br />5.00 % ({ <br />7,500 feet <br />2,650 Ibs/LCY <br />75% Earth <br />JOB TIME AND COST <br />• Fleet size : 1 Dozers) <br />Unit cost : $0.832 /LCY <br />Material consistency description <br />Comoacted fill or embankment <br />Material weight <br />Weight description <br />Decomposed rock - 25% Rock, <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 0.90 <br />Altitude : 1.00 <br />Material weight : 0.87 <br />Blade type : 1.00 <br />Net correction : 0.35 <br />Adjusted unit production : 245.95 LCY/hr <br />Adjusted fleet production : 245.95 LCY/hr <br />Total job time : 40.00 Hours <br />Total job cost : $8,180 <br />~ir Z~ ~J ~v`'O ~~3/06 SLOZ <br />
The URL can be used to link to this page
Your browser does not support the video tag.