My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42054
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:35 PM
Creation date
11/20/2007 11:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/6/2007
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> PROJECT IDENTIFICATION <br /> Task # : 037 <br /> Date : 11/08/2006 <br /> User : JRS <br />CIRCES Cost Estimating Software <br />State :Colorado <br />County :Las Animas <br />Site :New Elk Mine <br />Agency or organization name :Colorado Division Of Minerals And Gec <br />Permit or other job action :Partial Phase 1 Bond Release SL-02 <br />Task description :Finish Grade East Portal Area <br />HOURLY EQUIPMENT COST <br />Basic machine :CAT 14N <br />Attachment no. 1 :NA <br />Attachment no. 2 :Multi-shank ripper <br />Horsepower: 215 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown Ownership cosUhour : $36.31 NA <br /> Grader operating cosUhour : $40.92 100 <br /> Ripper operating cost hour : $0.00 0 <br /> Operator cosUhour : $24.47 NA <br /> <br />• Total unit cosUhour <br />MATERIAL QUANTITIES $101 69 Total fleet cost/hour $101 69 <br /> Total area to be graded or ripped : 79,70 acres <br /> Source of estimated acreage :Map 11 <br />HOURLY PRODUCTION <br />Selected application <br />Average grader speed :Finish grading (0.2.5 mph) <br />: 1.25 mph <br />Selected blade angle <br />Effective blade length : <br />Width of blade overlap per pass : <br />Net grading or ripping width per pass : <br />Unadjusted hourly unit production : : 30 <br />12.10 <br />2.00 <br />10.10 <br />1.5303 degrees ' • at 0 degrees, blade is perpendialar <br />feet to direction or travel. <br />feet <br />feet " •• width of upper beam on ripping applications <br />acres/hour <br />Job Condition Corcection Factors <br />Average site altitude : 7,500 feet Altitude adjustment factor : 1.00 Source <br />(Cat HB) <br />Job efficiency adjustment factor : 0,85 (1sh/d mod J <br />Net job correction : 0.8500 multiplier <br />Adjusted hourly unit production : 1.3008 acres/hour <br />Adjusted hourly fleet production : 1.3008 acres/hour <br />• JOB TIME AND COS7 ~ ~ ~~~ ~~~~ ~~ ~~ ~' -~~ _ .. <br />Fleet size : 1 grader(s) Total lob time . 61,27 hours <br />Umt cost $78 18 per acre Total job cost : $6,231 <br />PermiUjob # : C-1981-012 <br />Abbroviation :none <br />Filename : C012-037 <br />... ........... <br />ZFl /~-~{/ r~/~3~ G -1GOz <br />
The URL can be used to link to this page
Your browser does not support the video tag.