My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42054
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:35 PM
Creation date
11/20/2007 11:00:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
3/6/2007
Section_Exhibit Name
Exhibit 28 Appendix B
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 027 <br />Date : 11/08/2006 <br />User : JRS <br />State :Colorado <br />County :Las Animas <br />Site :New Elk Mine <br />Agency or organization name :Colorado Division Of Minerals And G <br />Permit or other job action :Partial Phase 1 Bond Release SL-02 <br />Task description :Rip West Portal Area Prior to 7 <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D9R - 9SU (2005) <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 1-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 perday <br /> Data source : (CRG) <br /> Utilization <br /> Cost Breakdown : Ownership cosUhour : $74.56 NA <br /> Dozer operating cost/hour : $98.84 100 <br /> Ripper operating cost/hour : $9.99 100 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cost/hour : $216.17 Total fleet cosUhour : $648.50 <br />MATERIAL <br />• QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br /> Area : 32.78 acres Rip depth (ft) : 2.00 Volume : 105,770 BCY or CCY <br /> <br /> Source of estimated quantity :Page 2.05-46; Map 17 <br /> Source of estimated load factor : NA <br /> ,. ...... <br />HOURLY PRODUCTION <br /> Alternate methods - Job Condition Correction Factors - <br /> Seismic : Seismic velocity : NA feet/second Unadjusted production <br /> Unadjusted production : NA cu. yds./hour per selected method : 4,338.16 cu. yds./hour <br /> <br /> Area : Avg. ripping depth : 4.05 feet/pass Site altitude : 7,500 feet <br /> Average ripping width : 6.08 feeVpass Altitude adjustment : 1.00 (Cat HB) <br /> Average ripping length : 200.00 feeUpass Job efficiency factor : 0.83 (1 shift/day) <br /> Average dozer speed : 88.00 feeUminute Net job correction : 0.83 multiplier <br /> Average maneuver time : 0.25 minutes/pass <br /> Production per unit area : 0.664 acres/hour Adjusted unit production : 3,600.67 cu. yds./hour <br /> Unadjusted production : 4,338.16 cu. yds./hour Adjusted fleet production : 10,802.02 cu. yds./hour <br /> JOB TIME~~AND COST ~ ~~ ~~ <br />• Fleet size : 3 dozers) Total job time : 9.79 hours <br /> Unit cost : $0.060 per cu. yd. Total job cost : $8,350 <br /> ~X Z~l % -3 q u~/3~o~ ~~oz <br />Permifrob # :C-1981-012 <br />Abbreviation :none <br />Filename : C012-027 <br />and Reseeding <br />
The URL can be used to link to this page
Your browser does not support the video tag.