Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 011 <br />Date : 11/08/2006 <br />User : JRS <br />State :Colorado <br />County :Las Animas <br />Site :New Elk Minn <br />Agency or organization name :Colorado Division Of Minerals And Geolo <br />Permit or other job action :Parts! Phase I Bond Release SL-02 <br />Task description :Rip Cover Material at RDA for DWP <br />HOURLY EQUIPMEN7 COST <br />PermiUjob # : C-1981-012 <br />Abbreviation :none <br />Filename : C012-011 <br />Basic machine :Cat D9R - 9SU (2005) Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab Shift basis : 1 perday <br />Attachment no. 2 :1-shank ripper <br />Data source : (CRG) <br />Utilization <br />Cost Breakdown : Ownership cosUhour : $74.56 NA <br />Dozer operating cost/hour : $98.84 100 <br />Ripper operating cosUhour : $9,99 100 <br />Operator cost/hour : $32.78 NA <br />Total unit cosVhour : $216.17 Total Fleet cosUhour <br />MATERIAL QUANTITIES ~ - - <br />• <br />Alternate methods - <br />Seismic : 4,444 <br />Area : l~q <br />BCY <br />acres <br />Selected estimating method <br />$648.50 <br />Seismic <br />4,444 BCY <br />NA BCY orCCY <br />Load factor : NA Bank volume <br />Rip depth (ft) : NA Volume <br />Source of estimated quantity :Map 15; Division Estimate <br />Source of estimated load factor :NA <br />HOURLY PRODUCTION <br />Altemate methods - <br />Seismic : Seismic velocity : 3,000 feeUsecond <br />Unadjusted production : 1,820.80 cu. yds./hour <br />Area : Avg. ripping depth : NA feet/pass <br />Average ripping width : NA feeUpass <br />Average ripping length : NA feet/pass <br />Average dozer speed : NA feeUminute <br />Average maneuver time: NA minutes/pass <br />Production per unit area : NA acres/hour <br />Unadjusted production : NA cu. yds./hour <br />JOB TIME AND COST <br />Fleet size . 3 dozers) <br />Unit cost : $0.143 per cu. yd. <br />Unadjusted production <br />per selected method :_ 1,820.80 cu. yds./hour <br />Site altitude : 7, 500 feet <br />Altitude adjustment : 1.00 (Cat HB) <br />Job efficiency factor : 0.83 (1 shiff/day) <br />Net job correction : 0.83 multiplier <br /> <br />Adjusted unit production : 1,511.26 cu. yds./hour <br />Adjusted fleet production : 4,533.79 cu. yds./hour <br />Total job time <br />Total job cost <br />0.98 hours <br />$638 <br />~x Z~' /,3-z~ r/~,~6 S~az <br />