Laserfiche WebLink
sheet 1 of 2 <br />Task # <br />Date <br />User <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />Agency or organization name :Colorado Division Of Minerals And Geology <br />007 State :Colorado PermiUjob # : C-1981-012 <br />11/08/2006 <br />JRS <br />Permit or other job action :Partial Phase 1 Bond Release SI-02 <br />Task description :Haul Northeast Coal Stockpile Footprint to Development Waste Pile <br />:.;: <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper <br />-Push dozer <br />. Cost Bre <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />ipment Description <br />627G <br />D9R - 9SU (2005) <br />`er Tanker, 5,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scrape2 dozer NA NA NA misctmk <br />Utilization-machine : 100 66 NA NA NA 25 <br />-Ripper attachment: NA 20 NA NA NA NA <br />Ownerhip cosUhour : $56.90 $64.72 NA NA NA $21.78 <br />OperatingcosUhour: $116.80 $65.36 NA NA NA $8.36 <br />Ripper op. cosUhour : NA $0.00 NA NA NA $0.00 <br />OperatorcosUhour: $24.95 $32.78 NA NA NA $34.24 <br />Unit subtotals : $198.64 $162.86 NA NA NA $64.38 <br />Number of units : 2 1 0 0 0 1 <br />Group subtotals : Work : $560.15 Support : $0.00 Maintenance : $64.38 <br />Total work team cosUhour : $624.53 <br /><,:. <br />_ _.. <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 4,750 CCY <br />factor : 1.185 volume : 5,629 LCY <br />Source of quantity take-off :Map 11 <br />• Source of estimated swell factor CAT Handbook <br />County :Las Animas <br />Site :New Elk Mine <br />Abbreviation :none <br />Filename : C012-007 <br />~x Z ~ ~3 -!9 ri/l3/~ ~ s~oz <br />