My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42052
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:35 PM
Creation date
11/20/2007 11:00:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
3/22/1989
Doc Name
MEMORANDUM OF POINTS AND AUTHORITIES INC OPPOSITION TO APPLICATION NO M-88-112
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />C. Battle Mountain Does Not Plan To Reclaim The <br />Two Mining Pits To Their Original Contours So <br />That The Land Can Be Returned To Range ................ll <br />D. Battle Mountain Has Not Adequately Addressed <br />Replacement Of Topsoils And Subsoils To Reclaim <br />Disturbed Areas .......................................12 <br />E. Battle Mountain Must Monitor The Heap Leach Area <br />To Ensure The Surrounding Soils Are Not Contaminated <br />Hy Cyanide Spray ......................................13 <br />F. Battle Mountain Must Monitor The Ground Water <br />For a Post-Reclamation Period .........................13 <br />G. Battle Mountain Does Not Plan To Reclaim The Wiaste <br />Rock Piles To An Uninterrupted Slope ..................13 <br />III. BATTLE MOUNTAIN HAS FAILED TO MEET MLRD'S CONCERN OVER <br />VARIOUS DESIGN FEATURES ...................................14 <br />A. The Secondary Soil Liner Is Inadequate ...............14 <br />B. The HDPE Liner Must He Anchored And Repaired <br />As Necessary .........................................15 <br />C. The Heap Leach and Ponds Should Be Underclaim <br />With A Leak Detection System .........................15 <br />D. An Emergency Pond Or Spillway Must Be Constructed <br />In The Heap Leach Area To Protect The Rito Seco......16 <br />E. Battle Mountain Must Test The Heap Leach Pond <br />Sediments For Cyanide Concentration Prior To <br />Disposal .............................................16 <br />F. Battle Mountain's Spi11 And Release Reporting <br />Proposal Is Inadequate In That It Fails To <br />Address Concern About Leaks From The Leach Pad.......17 <br />IV. CONCLUSION ................................................18 <br />ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.