Laserfiche WebLink
E5TINATINC FOflM - 68YBCBTATION t FSNCINC N08B cont'd Fileneae M005-3 sheet 2 of 2 <br />............................................. ........ <br />B. SBBUB 1 T688 T6ANSPLANT9 <br />===---====----==-=---=====-- NAT6B[AL:; PLANTING: f/F6BT. TOTAL TOTAL <br />SPBCIBS NANB QUAN./ACBB STOCB TFPB A SIZB ; $/PLANT S/PLANT PBLLBT ; OIPLANT ; f/ACBB <br /> <br />No transplants requited ; $0.00 <br /> <br />; ; ~ ; <br /> Tota] transplant cost/acre: 10.00 <br />C. SB6DBBD P68PA6ATION <br />----------------------- ____ __________ <br />----------------------- <br />Tilling aethod 41: <br />discing <br />$35.00 <br />42: <br />................................... <br />...................................... <br />.......... <br /> <br />D. SBBD APPLICATION <br />-------------------- <br />Total ---- <br />cost/acre: <br />---- ---------- <br />$35.00 <br />---------- <br />-------------------- <br />Seeding sethod: <br />drill seeding <br />................................... <br />Total <br />............................. ---- <br />castlacre: <br /> <br />---- ---------- <br />$48.00 <br /> <br />---------- <br /> <br />8, F68TILIZ[NC ---- ---------- <br />======----===== FBBTILI2B6 ( SOIL AMBNDNBNT UNITS/AC66 ; UNIT ; $/UNIT f/ACBB <br /> <br />Materials used il: No fertiliser/aaendaents required l0.00 <br />i2: <br />43: ; ; ' <br /> ----- ~ - <br /> Total arterials cost/acre: <br />---- $0.00 <br />---------- <br /> <br />Application aethod t1: <br />No fertiliser applicatioo required ---- ---------- <br />$0,00 <br />i2: <br />................................... <br />...................................... <br />.......... <br /> <br />Total application <br />COAL/rC[e: _ <br />SO.OO <br />F. NULCBINC ---- ======---- <br /> NULCB / NBTTINC / OTN86 NATBBIALS UNITS/AC66 UNIT $/UNIT $/AC66 <br />Nrterials ueed }I: <br />}2: <br />i3: <br />t4: <br />Application aethod }]: <br />}2: <br />03: <br />C. JOB COST <br />Total area to he seeded <br />Bstirated failure rate <br />straw (delivered - ton ; 2.00 ;ton ; $80.00 (120.00 <br />Total arterials coat/acre: $120.00 <br />-------------- <br />-------------- <br />power aulcher (at 2 too/acre rate( 0139,00 <br />crisping (with tractor attachaentl 033.00 <br />32.80 acres. <br />- - <br />30.001 of area <br />Total 0/acre <br />Total 0/acres <br />-------------- <br />Total applicatioo cost/acre: 0172.00 <br />0508.48 <br />--------- Total laitial Joh Cost= <br />- $18,812.70 <br />------------- <br />--------- <br />050fi.48 <br />Total - <br />8eseeding Coate = <br />. ------------- <br />$4,983.81 <br />............. <br />t Reseeding coat iteas: A C D F CflAND TOTAL JOB COST = 021,598,50 <br />-------------- <br />