• EXHIBIT L <br />RECLAMATION COS (REVISED January 7, 1998) <br />This reclamation cost estimate in based on the assumption that <br />there will be no more that 20.00 acres t disturbed at any one time. <br />It also assumes, that when it comes time to resoil the SLAB rock area <br />that only 12 inches of soil would be spread over the disturbed area. <br />The remaining overburden piles would be graded and seeded. At that <br />time we will have to respread 17,424 cubic yards of topsoil. The time <br />when the most bank sloping would be necessary is either at the begin- <br />ning of mining when the excavated area would have slope on all four <br />sides that needed sloping. On a 15 ac. area this would mean there are <br />2975 linear feet (LFT) around the exterior of the hole. Using the <br />numbers shown on the typical sketch and cross section attached and <br />assuming that since sloping would run concurrent with mining approxi- <br />mately 408 of the cut/fill work would be done and 358 of the rock fill <br />would be left. The table below outlines the various areas of distur- <br />bance at that time. A D-9 dozer will be used to do the shaping and <br />resoiling. The revegetation cost figure for the slab rock area <br />includes fertilizer, grass seed, mulch and drilling costs. The <br />revegetation cost for the surface rock area is only covers raking, <br />fertilizer and seed. The current tree cover is 238 of the site so <br />using 670 trees with a 608 survival rate so 400 per ac. remain we need <br />to plant 2600 on 3.92 acres of the 15.0 ac. <br />STAGE TOTAL SOIL DEPTH <br />NEEDS RES OILING 1 O.BO 1 2° <br />REVEGETATION SLAB AREA 1 S.O^ <br />R EVEG STATION SURFACE AREA 5.00 <br />SLOPE CUT/FILL 2468 LINEAR FEET <br />SLOPE ROCK FILL Bfi5 LINEAR FEET <br />RES OIL @ 1 2~ 1 7,424 CUBIC YARO5 <br />EST/MATED UN/T COSTS FOR RECLAMAT/ON /TEMS: <br /> Unit Cost <br />1. Revegetation Slab Area includes grass seed, <br /> mulch and fertilizer and labor to drill $ 500.00/AC. <br />2. Revegetation Surface Area includes grass seed <br /> fertilizer and labor to prepare site $ 125.00/AC. <br />3. Tree costs includes planting and stock 55.50/100 <br />4. Re-spreading soil and/or growth media with <br /> D-9 cat push distance 390 ft or less $ 0.438/YD3 3/ <br />5. Slope Reduction of mine face, 2050 lft; eve <br /> height 10 feet D-9 cat push distance 20 ft or less $ 0.109/YD3 !~ <br />6. Slope Reduction rock fill, 1025 lft; eve <br /> D-9 cat push distance 100 ft or less $ 0.189/YD3 1~ <br />RECLAMAT/ON COSTS <br />1. Revegetation, 15.00 ac @ $500.00/ac $ 7,500.00 <br />2. Revegetation, 5.00 ac @ $125.00/ac 625.00 <br />3. Tree planting 3.9 ac @ 6.7/units /ac @ $55.5/unit 1,443.00 <br />4. Resoiling, 17,424 yd3 * 1.12 @ 43.8C/yd3 8,500.72 <br />5. Slope Reduction of mine face, 8,638.0 yd3 * 1.23 <br /> @ 10.30/yd3 944.90 <br />6. Rock fill at mine face, 3780.0 yd3 @ 18.90/yd3 714.22 <br /> Net Total $19,727.84 <br />5. indirect costs <br /> Mobilization 1,961.10 <br /> Insurance, Bond, S Profit 2,470.91 <br />6. Administration costs 1,972.78 <br /> TOTAL ESTIMATE 26,132.63 <br />RECOMMEND BONG BE SET AT 526,100.00 <br />1/ Figured using Cat Handbook and rental coats from local sources for 638 effi- <br />ciency, D-9 dozer, for eastern Colorndo. <br />