Laserfiche WebLink
any potentially impacted resources requiring avoidance or specific mitigation measures (refer to <br />accompanying documentation). <br />It is not anticipated that any road construction will be required to access the sites since the existing <br />road network provides access and the proposed activities will occur during the period August through <br />November, when favorable ground conditions prevail. Reclamation of exploration disturbance areas <br />will involve plugging and sealing the coreholes, allowing the mud pits to dry-out and then backfilling <br />the pits, regrading the drill-pads, replacing windrowed topsoil, and reseeding the areas. Dependent on <br />location and aspect, one of three reclamation seed mixtures (pastureland, cropland, or <br />rangeland/wildlife) will be used. Selection of the appropriate seed mixture will be based on the pre- <br />disturbance vegetation community and land use. The estimated cost for reclamation of the proposed <br />exploration disturbance is approximately $58,500, for purposes of bonding. <br />We appreciate your consideration and cooperation in facilitating timely review and approval of this <br />submittal. Once you have had opportunity to review this submittal package, please feel free to contact <br />meat 970-870-2712 with any questions or comments. <br />Best regards, <br />For BTU Em ~ /~yat~ion <br />Iii%// <br />Jerry M. ett ton <br />Enviro al Supervisor <br />Attachments <br />cc: Moffat County Clerk and Recorder <br />R. Thompson <br />M. Berdine <br />