My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE42007
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE42007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:33 PM
Creation date
11/20/2007 10:59:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/15/2002
Section_Exhibit Name
Exhibit 10 Air Pollution Emission Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Bowie Resources ltd. <br />Permit No. 96DL103-4 <br />Initial Approval <br />Pape 2 <br />not exceed 20% opacity as determined by EPA Method 9 procedures. <br />In addition, the following requirements of Regulation No. 6, Part A, Subpart A, General Provisions, <br />apply at that time: <br />No article, machine, equipment or process shall be used to conceal an emission <br />which would otherwise constitute a violation of an applicable standard. Such <br />concealment includes, but is not limited to, the use of gaseous diluents to achieve <br />compliance with an opacity standard or with a standard which is based on the <br />concentration of a pollutant in the gases discharged to the atmosphere. (4 60.12) <br />b. Written notification of construction and initial startup dates shall be submitted to <br />the Division as required under 4 60.7. <br />c. Records of startups, shutdowns, and malfunctions shall be maintained, as required <br />under 4 60.7. <br />• <br /> <br />5. At all times, including periods of start-up, shutdown, and malfunction, the facility and control <br />equipment shall, to the extent practicable, be maintained and operated in a manner consistent with <br />good air pollution control practices for minimizing emissions. Determination of whether or not <br />acceptable operating and maintenance procedures are being used will be based on information <br />available to the Division, which may include, but is not limited to, monitoring results, opacity <br />observations, review of operating and maintenance procedures, and inspection of the source. <br />6. A revised Air Pollutant Emission Notice (APEN) shall be filed when a significant change in actual <br />emissions occurs (above the level reported on the last APEN, submitted to the Division) as required <br />by Regulation No.3, Part A.II.C.2 as per the timetable in Regulation No.3, Part A.II.C.3. <br />7. In accordance with C.R.S. 25-7-114.1, the Air Pollutant Emission Notice (APEN) associated with <br />this permit is valid for a term of five years. The five year term for this APEN expires on February <br />12, 2000. A revised APEN shall be submitted no later than 30 days before the five year term <br />expires. <br />av: <br />ose Molloy <br />ermit Engineer <br />6y: <br />DerYnis M. Myers, P.E.- <br />Construction Permits nits <br />Stationary Sources Program <br />Air Pollution Control Division <br />029/0008/021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.