Laserfiche WebLink
A <br />sheet 1 of Z <br />I • <br />CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Agency or organization name :Colorado Division O/Reclamation, Mining And Sa/ety <br />Task # : 173 State :Colorado Pennitlob # : C-1998-083 <br />Date : 11Po22006 County :Delta Abbreviation :none <br />User : JRS Site :Bowie No. 2 Mine Filename :C083-173 <br />Permit or other job action :Technical Revision 44 <br />Task description :Replace Subsoil from Stockpile !o Gob Pile <br />;• .. , <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 627G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area ; NA <br />-Dump area :NA <br />Road maintenance -Motor grader :NA <br />-Water thick :NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : screpe2 NA NA NA NA NA <br />°h Utilization-machine : 100 NA NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />OwnerhipcosUhour: $60.47 NA NA NA NA NA <br />Operating cosUhour: $119.18 NA NA NA NA NA <br />Ripper op. cosUhour : NA NA NA NA NA NA <br />Operator cost/hour : $24.95 NA NA NA NA NA <br />Unit subtotals . $204.60 NA NA NA NA NA <br />Number of units : 2 0 0 0 0 0 <br />Group subtotals : Work : $409.20 Support : $0.00 Maintenance : $0.00 <br />Cost BrE <br />Total work team cosUhour : 5409.20 <br />,. ,. , <br />MATERIAL QUANTITIES <br />Initial Swetl Loose <br />volume : 41,600 CCY <br />factor: 1.165 volume: 48,464 LCY <br />• Source of quantity take-off :Appendix A <br />Source of estimated swell factor :CAT Handbook <br />