Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd <br />sheet 3 of 9 <br />H. EARTHWORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost ($) <br />Subtotal IH): <br />I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cos[ !57 <br />Subtotal (I1: <br />J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description ~ Cost I$) <br />________I____________'____________________________________I_ <br />1 <br />2/4 <br />3/6 <br />6 <br />] <br />Top soil settling bas rns-use dozer <br />Topsoil Wash pond area-use scraper <br />Topsorl "Tract "C" <br />Topsoil plant site <br />Topsoil pit slopes <br />5]]0 <br />53,390 <br />53,916 <br />511,]]6 <br />53. R66 <br />Subtotal IJ): $23,]18 <br />