Laserfiche WebLink
• <br />Peabody Holding Company: Notice of Violation List <br />For NOV's Issued Between ~Onsn995 <br />95-057 Company: Senen Coal Company <br />Mine: SENECA II-W <br />Permit: C-82-057 <br />Coumy: ROUTT <br />and 03/05/1998 <br />Page: 1 <br />Date: 21-Aug-98 <br />MSHA ID: 65-00304 <br />Sfate: Colorado <br />NOV: C-95-023 Isaued: 10176195 <br />Issuer: Colorado Division of Minerals and Geology <br />Cawe: FAILURE TO CONSTRUCT DRAINAGE AS APPROVED IN RECLAMATION PLAN AND <br />FAILURE TO GRADE DISTURBED AREA AS APPROVED IN RECLAMATION PLAN: <br />Status: TERMINATED: 07!17/97; <br />As of: 7/17/97 <br />Action: CONSTRUCTED POST MINING TOPOGRAPHY INCLUDING POST MINING(PERMANENT) <br />DRAINAGE CHANNELS AS APPROVED IN THE RECLAMATION PLAN(fA8 20); <br />Penalty: CONFERENCE HELD 12/12/95; 51900.00 ASSESSMENT PAID ON 01/10196; <br /> <br />9696-065 Company: Seneca Coal Company <br />Mine: YOAST MINE <br />Permit: C-94-082 MSHA ID: 05-00304 <br />County: ROUTi Sfate: Colorado <br />NOV: C-96.015 Issued: 7/19/96 <br />Issuer: Colorado Division of Minerals and Geology <br />Cause: FAILURE TO PROPERLY DESCRIBE LIGHT USE ROAD,RECEIVE APPROVAL OF <br /> SUBSTATION PLACEMENT AND FAILURE TO PASS DRAINAGE FROM SUBSTATION PAD <br /> THROUGH TREATMENT FACILITY; <br />Status: TERMINATED: 1) 0726/96; 2) 07/26196; 3) 0726/96: <br />As of: 11/12/96 <br />Aetlon: 1) PLACED TEMPORARY SEDIMENT CONTROL AT SUBSTATION UNTIL POND WAS <br /> CONSTRUCTED; 2) SUBMITTED FOR APPROVAL A TECHNICAL REVISION FOR THE LIGHT <br /> USE ROAD LEADING TO THE SUBSTATION; 3) IMPLEMENTED DESIGN APPROVED FOR <br /> EROSION CONTROL; <br />Penalty: ASSESSMENT CONFERENCE HELD 9/30196; 51,000.00 PAID ON 11/12/96; <br />96.069 Company: Seneca Coal Company <br />Mine: YOAST MINE <br />Permit: C-94-082 MSHA ID: OS-00304 <br />County: ROUTi State: Colorado <br />NOV: C-96-076 Issued: 7/31/96 <br />Issuer: Colorado Division of Minerals and Geology <br />Cawe: FAILURE TO DESCRIBE AND DESIGN LIGHT-USE ROAD LEADING 70 TOPSOIL STOCKPILE <br />D FOR APPROVAL; <br />Status: TERMINATED: 08/09!96; <br />As of: 11/12196 <br />Action: SUBMITTED REVISION TO THE DIVISION FOR THE LIGHT-USE ROAD LEADING TO <br />TOPSOIL PILE D; <br />Penalty: ASSESSMENT CONFERENCE HELD ON 9/30/96; 51000.00 WAS PAID ON 71/12196; <br /> <br />