ONGOING OPERATING AND MAINTENANCE ACTIVITIES <br />MCC will utilize existing roads and yet to be constructed roads to access <br />exhausting blowers for maintenance and service. Each methane fired blower engine will <br />be serviced at 400-hour intervals. All used fluids and trash will be returned to the mine <br />site for proper disposal. Periodically MCC will haul water to the exhausting blowers for <br />cleaning with a portable pressure washer. Water from cleaning will be recovered from the <br />blower containment tanks and transported to the mine site for disposal. <br />From time to tune, methane exhausters may have to be moved as part of a <br />plamied or an un-planned activity. These moves could occm• at any time of the year as <br />mining conditions and needs dictate. MCC will notify the Forest Service within 24 hours <br />of a move that would occur as an unplanned event. Planned moves as part of normal <br />activity would be addressed with the Forest Service in accordance with item 41 of the <br />Conditions of Approval, in the Decision Notice dated May 31, 2002, titled Coal Methane <br />Drainage Project Panels 16-24 Mountain Coal Company West Elk Mine. To keep <br />current with improving technology, MCC requests the ability to change exhauster <br />alignments, equipment, and add additional equipment as necessary to meet the needs of <br />the mine as such equipment and/or technology becomes available. MCC will notify the <br />Forest Service of any major change in alignment, quantity and/or configuration of the <br />exhausting equipment prior to installation. <br />MCC proposes to use 4X4 pickup trucks (wheeled or tracked), ATV's snowcats, <br />and snowmobiles for primary access to the sites during the appropriate seasons. Heavy <br />equipment including, but not limited to, bulldozers, backhoes, and boom trucks will be <br />utilized to move and maintain blower units. <br />ONGOING MONITORING ACTIVITIES <br />MCC proposes to access all exhausting blowers for monitoring and sampling on a <br />daily basis. At times, multiple trips per day will be necessazy to maintain operation of <br />blower units. Access is required year round. <br />MCC proposes to use 4X4 pickup trucks (wheeled or tracked), ATV's snowcats, <br />and snowmobiles for primary access to the sites. Heavy equipment including, but not <br />limited to, bulldozers, backhoes, and maintainers will be utilized to maintain roadways to <br />the blower units. MCC may plow snow from the project roads as necessazy to access the <br />MDW's during winter months in accordance with Road Use Penmit (RUP). Stipulations <br />on snow plowing as defined in the Decision Notice and RUP will be followed. <br />2007 SPECIAL ACTIVITIES <br />It will be necessary to conduct a timber cruise of the proposed road conshuction <br />areas previously mentioned on or about June 5~' so that construction may proceed <br />immediately upon completion and approval of the Bird Survey. <br />Due to the unpredictable nature of mining and the unknown conditions that are <br />frequently encountered as mining progresses it is likely that some event will occur that <br />14 <br />