Srptrmhrr 1998 Srnrto IIIY/ South E apannan 'Drainage anASrrlimrn! Contml Plan • 5 <br />4.0 PONDS <br />. All three ponds are designed to effectively treat the peak runoff produced from the 10-year, 24-hour <br />storm event. The ponds were designed using SEDCAD+ computer program. The input pazameters <br />and results are shown on the SEDCAD+ printouts located in Appendix 1, Sediment Pond SEDCAD <br />Results, and summarized in Table 5. The location of the ponds along with pond and embankment <br />configurations for Ponds 015, O1G and 017 can be found on Drawings <br />13-8,13-8A and ]3-8B. <br />All three ponds will employ a principal spillway which consists of an S foot tall, cmp riser, with a cmp <br />culverc. AU three ponds employ an emergency spillway. The spilways will be a trapezoidal channel <br />with 3H:1 V side slopes. The outslope of the spillways will be armored. The spillways are designed to <br />safely pass the peak discharge from the 25-yeaz, 24-hour storm event .vhile maintaining over 1 foot of <br />freeboard. The spillways are conservatively designed assuming the prinupal spillway is clogged and the <br />water level is at the invert level of the spillway prior to the storm event. <br />The embankments for all three ponds are less than ] 5 feet in height when measured from the upstream <br />side. The embankments will be constructed with 3H:1V slopes and a top width of 75 feet. Prior to <br />construction of the embankments all topsoil will be removed and stockpiled. A keyway will be cut <br />down the center of the embankment. The embankment will be constructed in lifts not exceeding <br />twelve inches in loose thickness. Each lift will be compacted by at least one pass of the bulldozer <br />tracks over the entire lift before additional material is placed. The fill material will not contain sod, <br />large roots, other large vegetative matter, or coal waste. Placement will not occur during periods of <br />excess moisture. <br />5.0 HAUL ROAD CHANNEL AND CULVERT DESIGNS <br />• All haul road ditches were designed to safely pass the peak discharge from the 10-year, 24-hour event. <br />The ditch dimensions were determined using Mannings Equation for open channel flow. All road side <br />ditches will be gravel lined. All road side ditch inputs and results can be found in Appendix 2, Haul <br />Road Channel and Culvert Designs. The design results and ditch locations are shown on Exhibits 13- <br />21.1, 13-22.1 and 13-23.1. As shown on the ditch results, the flow velocities for all the road side <br />ditches aze less than G feet per second and will not require riprap. <br />The culvens were designed to safely pass the peak dischazge from the ]0-yeaz, 24-hour event. The <br />culverts were sized using the U.S. Bureau of Public Roads nomograph. All culvert design inputs and <br />results can be found in Appendix 2, Haul Road Channel and Culvert Designs. <br />Haul Road J is designed as a relatively flat road and the location and length of road side channels and <br />location of culverts is difficult to predict until the road is built. Given the difficulty to predict the <br />location and length of the ditches, the ditches were conservatively designed to handle the peak <br />dischazge from the entire watershed above Hau] Road J. Culver J1 was also conservatively designed <br />to handle the peak discharge from the entire watershed above Haul Road J and Haul Road I. Culvert <br />J-2 vas designed to pass the peak flow from the entire watershed above the Pond 076 system, <br />assuming worst case disturbed conditions. Additional culverts may be required along Haul Road J. <br />These additional Culverts were conservatively designed to handle the peak dischazge from the entire <br />watershed above Haul Road J. <br />• <br />Montgomery Wrahon hlimnr C.mup • lGi S. Uuon Bou&ian1, Suin 1G0 • t~birvwd. Gdo ~ 80778 • (970) 763-5110 <br />Rev 1/02 <br />