My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41912
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:28 PM
Creation date
11/20/2007 10:57:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
EXHIBIT E RECLAMATION PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />' 1. Grading and drainage control establishment and <br />maintenance will be conducted in mid to late <br />' summer; <br />' 2. Seedbeds will be prepared in late summer or early <br />fall in time for the seeding; and <br />' 3. Seeds will be planted in mid to late fall to take <br /> advantage of winter and spring moisture. If seeding <br />' cannot be completed in the fall, the alternative <br /> season is early to mid spring for seeding in this <br />' region. <br />' E.3 Reclamation Implementation <br /> E.3.1 Mine Pits <br /> <br /> E,3.1.1 East Pit <br />' ~ <br /> As indicated in the Mining Plan, mining is expected to <br />' begin in the East Pit and shift, in approximate sequence, to <br /> the West Pit as the economic limits are approached. As <br /> indicated in Section D.3, the East Pit will be backfilled with <br />' approximately two million tons of waste rock from the West Pit <br /> as a part of the mining process. Figure C-4 shows the post: <br />' mining configuration of the East Pit and Figure E.3.1-1 shows <br /> cross-sections of the East Pit area. The backfill ng will blend <br />' with the surrounding topography. Backfilled areas of the East <br /> Pit will be sloped at the angle of repose (approximately <br />' 1.5H:1V) with 15-ft wide benches every 50 ft in vertical <br /> height. Upon completion of backfilling, the angle of repose <br /> slopes will be graded to eliminate most of the 75~ ft wide bench <br />' area. Benches of approximately a dozer width will be maintained <br /> to aid in sediment and erosion control. The lowest bench will <br />' be left at 1.5H:1V to approximate the original contours. <br />1 <br />E-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.