My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41904
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:28 PM
Creation date
11/20/2007 10:56:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
8/19/2005
Doc Name
2nd Adequacy Response
From
Banks and Gesso LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MMRR Quarry, M-2004-067 <br />Response to June 30 Adequacy Review (as amended) <br />August 19, 2005 <br />Page 18 <br />c. Dust control for 3 months: Using a cost of $10/1,000 gallons of water <br />equals $300 per day for 30,000 gallons of water. For 78 days (6 days per <br />week for 3 months or 13 weeks) of dust control, the water supply would <br />cost $23,400. Using a cost of $220 for a round trip to bring 10,000 gallons <br />of water to the site equals $660 per day to haul water to the site. For 78 <br />days of operation, the cost to haul water to the site would be $51,480. <br />Total cost for dust control is $74,880. <br />d. Mob/Demob Reclamation Equipment: Using information from Permit No. <br />M-1983-033, the cost to remove reclamation equipment, which includes a <br />dozer, loader, blade and track hoe, is estimated to be $4,500. This <br />amount includes the cost of a 40-mile haul to remove equipment and the <br />cost to mob/demob reclamation equipment. <br />Item and Units Quantity Unit Price Cost <br />Drill & Blast Sequence 173,733 yd3 $1.375/ yd3 $238,883 <br /> <br />Backfilling & Grading 173,733 yd3 $0.11/ yd3 $19,111 <br /> <br />Dust Control <br />Water Supply 78 days $300/day $23,400 <br />Transport 78 days $660/day 51 480 <br /> <br />Total Dust Control $74,880 <br /> <br />Mob/Demob Equipment $4,500 <br /> <br />Planting Contingency 50% failure rate $40,247 $20,124 <br />As noted in response to adequacy comment 34, above, note that an Exhibit L, <br />Reclamation Cost Estimate, item has also been added to account for the <br />contingency of a 50% failure rate in plantings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.