My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41904
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41904
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:28 PM
Creation date
11/20/2007 10:56:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004067
IBM Index Class Name
Permit File
Doc Date
8/19/2005
Doc Name
2nd Adequacy Response
From
Banks and Gesso LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MMRR Quarry, M-2004-067 <br />Response to June 30 Adequacy Review (as amended) <br />August 19, 2005 <br />Page 14 <br />emphasize that temporary irrigation is to be employed for the purposes of <br />establishment, and not to the level where artificial soil moisture conditions will <br />encourage rooting where roots would not be viable in the long-term. <br />The operator commits to using watering techniques to the extent reasonably <br />necessary to establish the proposed revegetation plan. This is a performance <br />standard, reflected in Rule 3.1.10(5). As noted under the response to Exhibit G, <br />below, the final reclamation process will allocate up to 30,000 gallons per day to <br />irrigation. It is anticipated that a portable water tank could be located on the site <br />and, with a pump, used to feed drip lines that would provide soaking moisture to <br />the plant growth medium around woody plants. A spray mechanism on a water <br />truck and/or sprinklers fed from the water tank would supply area coverage on an <br />as-needed basis to provide soaking moisture to grass seed. <br />Exhibit G -Water information <br />36. The applicant has indicated that the only water requirement for this project is for dust control <br />and possibly for irrigation of re-vegetated areas in the early stages of plant growth. The applicant <br />has estimated the initial daily water requirement to be 30,000 gallons per day. In conformance <br />with Rule 6.4.7(3), please clarify whether this estimated daily water requirement pertains to the <br />initial development stage or the mining phase of the operation. Also, please provide an estimate <br />of the daily or annual water requirements for irrigation of tree and shrub transplants during final <br />reclamation. <br />To clarify the application document, the "initial estimate" of water requirements <br />applies to all phases of work for the purposes of Rule 6.4.7(3), including site <br />development, mining, and reclamation. The stipulation in the initial application, <br />that washing of aggregates will not take place on the site, reduces the need for <br />water on the site to that needed for dust suppression and irrigation of certain <br />reclaimed areas. Dust suppression will generally concentrate water applications <br />to internal haul roads, aggregate stockpiles, and pre-moistening of rock in the <br />active quarry face. At any given stage of mining, 30,000 gallons/day will provide <br />a sufficient budget to actively suppress dust. The 30,000 gallon budget is also <br />sufficient to cover all phases of reclamation, up to and including the final <br />reclamation of all 40 acres. The selected species for revegetation are suitable to <br />the low water budget typical of the area; an average import of 30,000 gallons/day <br />is more than ample to meet the appropriate 3 gallons per square foot water <br />budget indicates for such species in standard landscape water budgets. <br />Small amounts of water for drinking and hand washing will also be imported to <br />the site and are included in the estimate of 30,000 gallons/day. This initial <br />estimate will be adjusted as needed to conform with other performance <br />standards expressed in this application and review process -for example, <br />additional water may be imported to enhance plant establishment. <br />
The URL can be used to link to this page
Your browser does not support the video tag.