Laserfiche WebLink
• C4) After the estimated date of issuance of a permit by the <br />Division. <br />RESPONSE: <br />The map distinguishing each phase of previous surface coal <br />mining is included as Map 16, Energy Miae No. 3 Reclamation. <br />Portions of the proposed permit area that will be subjected to <br />surface coal mining operations after the estimated date of permit <br />isauaace by the Division is shown on Map 6, Mine Plan. <br />Rule 2.10.3 - Specific Information Requirements <br />• <br />(1) In addition to any other maps specifically required by Rule 2, <br />the permit application shall include maps showing: <br />(a) All boundaries of lands and names of present owners of <br />record of those lands, both surface and subsurface, included in or <br />contiguous to Che permit area; <br />(b) The boundaries of land within the proposed permit area <br />upon which the applicant has the legal right to enter and begin surface <br />or underground mining activities; <br />C, <br />J <br />2.10-3 <br />