Table 5-1. Cont. - naae 2
<br />• Topsoil
<br />Pile ID
<br />Location Coordinates
<br />Northing Easting Size
<br />(acres) Approximate
<br />CYDS Date
<br />Created
<br /> F96-1 North End of Ash Dump 408,311 1,428,096 1.7 22,120 1996
<br /> F96-2 Between Piles F95-1 and F95-2 404,200 1,426,200 2.2 46,032 1996
<br /> F97-1 South of A97-1 approx. 1,700 ft 403,790 1,430,700 3.0 77,644 1997
<br /> FS1 Anfo silo 410,280 1,410,900 0.2 550 1980
<br /> G10.1 North of LOM rd Q G Pit 407,740 1,434,270 4.0 105,532 2001
<br /> GP-1 Grouse Pond 412,925 1,429,530 0.9 13,212 1993
<br /> H93-1 H pit West #1 411,540 1,422,060 4.7 100,456 1993
<br /> H93-2 H pit North #2 412,720 1,422,940 3.3 95,666 1993
<br /> H93-3 South H pit #3 406,940 1,424,040 5.2 82,228 1993
<br /> HRS Horse Pond 403,090 1,432,930 1.0 22,485 2000
<br /> JG1 Johnson Gulch Dam #7A 411,700 1,419,700 1.6 25,116 1980
<br /> JG2 Johnson Gulch Dam #8 412,500 1,420,150 1.2 15,458 1986
<br /> JG3 Johnson Gulch Dam fl9 413,100 1,420,300 1.4 14,269 1986
<br /> JG4 Johnson Gulch Dam #10 414,250 1,419,950 1.7 25,777 1987
<br /> JG5 Johnson Gulch Elect Station 414,250 1,419,450 0.5 6,209 1989
<br /> JG6 North A Haul Road Johnson 413,000 1,420,950 1.2 13,212 1987
<br /> JG7 North A Haul Road Ag Field W 412,400 1,422,250 0.5 16,850 1988
<br /> JG8 North A Haul Road Ag Field E 412,300 1,422,700 0.7 12,840 1988
<br /> LG1 Low grade coal topsoil pile 406,800 1,418,500 3.7 105,748 1985
<br /> MH7 Main haul road north 411,710 1,418,660 1.0 27,334 1986
<br /> MH2 Main haul road south 410,800 1,418,550 1.2 35,216 1982
<br /> MP1 Middle Pyeatt Dam #1 412,200 1,425,030 0.6 4,200 1986
<br /> MP2 Middle Pyeatt Dam #2 413,000 1,425,220 1.2 12,500 1986
<br />• MP7
<br />NN1 Middle Pyeatt Sediment Basin
<br />No Name Dam #4 411,000
<br />412,900 1,425,400
<br />1,415,640 0.2
<br />1.0 645
<br />10,372 1991
<br />1980
<br /> SC3 S curve east of (haul road runaway) 407,400 1,417,860 1.2 11,477 1989
<br /> SP5-94 SW of Sage Pond 412,600 1,430,555 0.6 6,318 1994
<br /> SP6-94 SE of Sage Pond 412,700 1,431,200 0.7 12,204 1994
<br /> SY1 Shop yard pullout expansion 413,660 1,419,250 0.2 900 1990
<br /> W62 West Buzzard Gulch West 411,200 1,407,300 0.3 1,580 1987
<br /> WB3 West Buzzard Gulch East 411,250 1,407,600 0.2 1,124 1987
<br /> WC1 Wye coal pile site 412,600 1,417,500 2.6 53,197 1978
<br /> WP2 West Pyeatt Dam #1 413,200 1,424,190 1.2 10,404 1991
<br /> WP3 West Pyeatt Pond #2 412,440 1,424,180 1.3 11,322 1982
<br /> ZTS-1 East of A97-1 Pile 405,440 1,430,900 6.5 133,476 2000
<br /> ZTS-2 West ofA99-1 Pile 408,270 1,434,100 0.7 14,644 2000
<br /> ZTS-3 Head of Horse Gulch 404,340 1,433,240 4.5 128,436 2001
<br /> Totals 196.9 4,164,272
<br />' In accordance with MR-155, all of piles A86-6, A92-4 and A92-5 were abandoned and A91-8 and A92-1
<br />were partially abandoned.
<br />(1) As of December 31, 2001