Laserfiche WebLink
SECTION 6.0 Stock Tank and Dozer Basin Construction Through 2001. <br />6.1 Stock Tanks <br />This section updates the location of all constructed stack tanks through 2001 (see Map(s) 3 Section 3.0). <br />The average tank density for Trapper mined-land areas will not exceed one tank per ten acres. Table 6- <br />1describes the as-built tank density in association with the specific drainage areas. <br />In 2001, Trapper constructed 11 new stock tanks in the following reclaimed drainages: No Name East <br />(3), East Pyeatt Main (4), East Pyeatt East (1) and Oak (3) (see Map(s) 3). Several new stock tanks <br />may be constructed in 2002. <br />Existing stock tanks meet applicable certification standards. <br />6.2 Dozer Basins <br />As a result of the approval of technical revision TR-73 (January 1997), dozer basin locations will be <br />provided in this Appendix W document on an annual basis (see Map(s) 3 Section 3.0). <br />Dozer basins assist sediment impoundments in the containment of sediment, reducing the frequency of <br />sediment impoundment Leaning. Dozer basins are typically constructed along haulroads, regraded <br />• spoils, and/or on short or long term disturbed sites. <br />rv~aros <br />]DMGUNPONDIetle-0] <br />• <br />