Laserfiche WebLink
L Toesoa <br />A. REMOVAL (10 acres ma:imam additional disturbance for life-of-project) <br />• Maximum tons removed per day: 1,000 Tons removed per year: 20.000 <br />Proposed controls for topsoil removal: (check appropriate bores) <br />^ Moist Material <br />^ Water Spray <br />^ Other (specify): <br />^x No Control <br />B. TOPSOIL STOCKPQ,E (90,000 tons ma:imam stored for life-of-project) <br />Maximum stored at one time: 90,000 tons Maximum stored per year: 90,000 t~ <br />Length of time pile remains undisturbed: l0 years plus <br />Proposed controls for topsoil stockpile: (check appropriate bo:) <br />^ Watering: times/day, or ^ continuous sprinkler (to maintain moist surface) <br />^ Chemical stabilizer (Type: ) <br />^x Compacting of piles, method: By scraper when dumping <br />• ^ Enclosures: complete, or partial (check one) <br />^x Revegetation (Length of time till revegetation: All piles currently rcvegetated) <br />^x Other (specify): Perimeter fence to prevent cattle grazing <br />^ No control <br />II. OVERBURDEN <br />A. REMOVAL - N/A <br />Maximum tons removed per day: <br />Equipment used for removal: <br />Tons removed per year: <br />Proposed controls for overburden removal: (check appropriate bores) <br />^ Moist Material <br />^ Water Spray <br />^ Other (specify): <br />^ No Control <br />• <br />2 <br />