Laserfiche WebLink
N. PRIMARY SCREENING ~ ~/~ <br />Tons of material feed per day = <br />Tons of material feed per year = <br />Hours of screening per day = 24 <br />Percent emission reduction = <br />• Type of control <br />O. SECONDARY CRUSHING OPERATION <br />Tons of material feed per day = <br />Tons of material feed per year = <br />Hours of operation per day = 24 <br />Percent emission reduction = <br />Type of control <br />P. SECONDARY SCREENING/CLASSIFYING <br />Tons of material feed per day = <br />Tons of material feed per year = <br />Hours of operation per day = 24 <br />Percent emission reduction = <br />Type of control <br />~. TRANSFER POINTS <br />Tons of material trans. per day = 7000 <br />Tons of material trans. per year = 500000 <br />Hours of operation per day = 4 <br />Number of transfer points = 3 <br />Average Wind Speed (mph) = 5.1 <br />Material Moisture Content (M) = 6.9 <br />Percent emission reduction = 70 <br />Type of control <br />~. ALL DISTURBED AREAS <br />Total acres of disturbed areas <br />Days of emission per year <br />Hours of emission per day <br />Percent emission reduction <br />Type of control <br />= 25 <br />= 365 <br />= 24 <br />= 75 <br />reveg. <br />S. VEHICLE TRAFFIC ON UNPAVED ON-SITE HAUL ROADS <br />Surface silt content (°~) = 8.4 <br />Surface material moisture content (%) = 0.2 'see Tab B for instructions on the use <br /># of days w/ .01" precipitation = 82 of this parameter <br />Vehicle Miles Miles Hrs. Veh. Wt. % Em. <br /># Per Day Per Year Per Day (tons) Reduction <br />1 33.142857 2857.1429 24 72.5 63% <br />2 24 0% <br />3 24 0% <br />4 24 0% <br />5 24 0% <br />6 24 0% <br />7 24 0% <br />8 24 0% <br />9 24 0% <br />10 24 0% <br />r~ <br />LJ <br />