My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41700
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41700
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:19 PM
Creation date
11/20/2007 10:51:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
Tab 22 AIR QUALITY CONTROL PLAN
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIR POLLUTION CONTROL DIVISION ~/, ~/ /~I <br />PRELIMINARY ANALYSIS <br />COAL MINING OPERATIONS <br />• DUST EMISSIONS <br />Permit # : OORO0297F Date 6/5/00 <br />Permitee :Hayden Gulch Terminal, Inc. Engineer : R K Hancock III <br />CounlylPianUPoint ~07It312 <br />WORK SCHEDULE: 24 hours/day 7 days/week <br />A. TOPSOIL REMOVAL <br />Tons of topsoil removed per day = <br />Tons of topsoil removed per year-- <br />Hours of operation per day = <br />Percent emission reduction = <br />Type of control none <br />8. TOPSOIL STOCKPILES <br />Total tons of topsoil stockpile <br />Days of emission per year <br />Hours of emission per day <br />Percent emission reduction <br />Type of control <br />24 <br />= 365 <br />= 24 <br />compaction, reveg. <br />C. OVERBURDEN REMOVAL BY BULLDOZER <br />number of bulldozers = <br />Hours of operation per year = <br />Hours of operation per day = 24 <br />• Material Silt Content (s) = 6.9 <br />Material Moisture Content (M) = 7.9 <br />D. OVERBURDEN REMOVAL BY DRAGLINE <br />Cubic yards per day <br />Cubic yards per year <br />Hours of operation per day = 24 <br />Drop Height (d) = 28.1 <br />Material Moisture Content {M) = 3.2 <br />E. OVERBURDEN STOCKPILE <br />Total tons of overbuy stockpile = <br />Days of emission per year = 365 <br />Hours of emission per day = 24 <br />Percent emission reduction = <br />Type of control compaction <br />F. OVERBURDEN DRILLING <br />Number of holes drilled per day = <br />Number of holes drilled per year = <br />Hours of emission per day = 24 <br />Percent emission reduction = <br />Type of control <br />Acres = <br />Acres = <br />ver:0898 <br />52 weeks/yr. <br />0 <br />0 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.