Laserfiche WebLink
11 ~ ~ <br />' f. Where necessary weed control will be accomplished by <br /> mechanical means. <br />' g. Fire lanes are not considered to be necessary. <br /> h. Final reclamation of the plant site and haul roads will be <br />' delayed until the mining has been completed. At that time, <br /> the same general cover, and planting procedures will be <br /> implemented as was used in the rest of the area. <br />' i. No adverse characteristics of the surface are expected which <br /> would seriously inhibit plant growth. <br /> (e) -The topsoil has been stockpiled and revegetated to promote <br /> stability. Revegetation of the area will follow redistribution of the <br /> <br /> topsoil. The grasses planned for revegetation are common to the area <br /> and are generally in good supply. Amore detailed discussion of topsoiling <br /> and revegetation appear in the preceding section on Performance Standards. <br />' (f) - The general timetable for reclamation is incorporated throughout <br /> this text. <br /> <br /> (g) - A detailed description of the topics required in this section may <br />' be found in Performance Standards above. <br />1 <br />1 <br />1 <br />1 <br /> <br />I~ <br />