Laserfiche WebLink
EXHIBIT B MINING <br />CONSTRUCTION MATERIAL WILL BE REMOVED WITH FRONT-END LOADERS AND <br />DOZERS STARTING FROM THE SOUTHEAST SIDE AND WORKING TO THE NORTH- <br />WEST. TRANSPORTATION TO THE PROJECT AREA IS BY TRUCK AND UPON <br />DEMAND. , <br />THERE WILL BE NO GROUNDWATER OR SURFACE WATER RIGHTS INVOLVED IN <br />THE OPERATION. NO WATER TABLE IS ANTICIPATED TO BE ENCOUNTERED <br />IN THE EXCAVATION. THERE WILL BE NO WATER REQUIRED FOR ANY ASPECT <br />OF THE OPERATION. <br />THE ACUTAL AREA TO BE MINED WILL COVER 5.0 ACRES, AS SHOWN ON THE <br />MAP. <br />THE TOTAL AFFECTED AREA WILL COVER NO MORE THAT 5.0 ACRES AS SHOWN <br />ON MAP. <br />TIMETABLE OF OPERATIONS: THE PROJECT WILL BE IN AN UNKNOWN AMOUNT <br />OF STAGES DEPENDING ON WHEN GROIIND IS NEEDED FOR SURFACING ROADS <br />IN THE AREA. <br />THE MATERIAL TO BE MINED WILL BE SAND AND GRAVEL. <br />NO MORE THAN 70,000 TONS OF MATERIAL WILL BE MINED INCLUDING <br />OVERBURDEN. <br />ANTICIPATED DEPTH OF PIT IS 8'. <br />TOPSOIL WILL BE STRIP TOPSOIL HAS 50 MUCH LARGE MATERIAL <br />THAT THE FINES CANNOT BE SEPA TED. <br /> __ .. <br />. r,.. ~ _ .~ <br />'. <br />~.....__ ,.,w. ~ -=,Stlexnn?r±.i~y'.~: ` <br />:tia .~br ~•,~A-;.,d ~•.,a~~:i~`~r-:~'33ti`,. i.;:initF~i.'~'.~'~ <br />