My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41596
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41596
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:14 PM
Creation date
11/20/2007 10:49:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986140
IBM Index Class Name
Permit File
Doc Date
2/19/1987
Doc Name
LIMITED IMPACT 110 SPECIAL TEN DAY 111 PERMIT APPLICATION FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' NID L1~T1D VILDLZ°E QUESTI04AIRE <br />• - ~,tmitea~i~pact and select regular minIications <br />~~ Compaay/Mine:_ R8K Cnnctrurtinn inr_ Pit # 9(1 <br />gee/Address/Phone of Contact Person :_ Marv E. Kirkland _ <br />r 489-3388 ~ P. 0. Box 376, Rve. CO 81069 <br />3. Loutioa o£ Zone: Park County, SW; of-SEzs of Section 14, T8S, R76W, 6th P. M. <br />(County, rbvnship, Range, Section to nearest quarter quarter; Exhibic A-ZII.R appl.) <br />4, Nearest Soon/General Locatioa: approximately 3 miles west of Jefferson <br />5. Land O~rnership (Circle) 1 Private 2. BL'i~ 3. LfSFS 4. Other <br />6. prey m c Land Dse: Grazeland <br />7, Pzoposed Final Land Dse: Grazeland <br />g, Type of Operation: 1. urfaee _ 2. IInderground <br />9.' Minerals beiag mined: Sand 8 Gravel <br />l0. Zfumber gad Descriptioa of Surfaee'Acres Disturbed by Hining/not including roads <br />(Exhibit D-ZiLR): 10 acres of native grassland ~ • <br />11. Hiles of roads to be constructed: 0 - <br />IZ. Life of Mine (gears): l year <br />I3. Description of Operation and Reclamation - Additional sheets may be :ctaehed ' <br />{Exhibits B b E-?4.R) _ •• <br />Mining Plan: The mining operation will cnncict of nom; it 9raval extraction and <br />processing. The mfninq equipment will be comoosetl of a crushing plant, tonveyors,• <br />and loaders. First topsoil. will be stockpiled far reclamation. Gravel will then <br />be excavated and processed. Mining wi1T begin along the east side and proceed <br />westerly. Upon completion; the existing stockpiled topsoil will tie mined with peat <br />moss and spread. over the affected area. The area wil and <br />mulched. ~ ~ ., <br />„~.. <br />' -,~. . <br />5= Please enclose Yaps of Project Ooeration, Distnrbanee Areas and &aela~ation (--c::aibit <br />~', C.) rnis will ennrpedite processing. Sour cooperation is appreciated. <br />Date: <br />^--- ' ,o ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.