Laserfiche WebLink
~, ', ~~~ <br />UN~ f/ERSA!- P~A~"i SAND ~ G 11'~IVEL.~Nc, <br />. o o- ~- r n r,i c r D~~ r?~ n ~~ r u r <br />n v .rT~~. .. .. .. ~. , ~. v. . <br />Exhibit ~ ~.N~`~-~ /r . <br />Mining Plan: The mining operation will consist of open pit gravel <br />extraction and processing. The mining equipment will <br />consist of a crushing plant, conveyors, loaders, and <br />dozers. The first plan of operation will be to strip <br />and stockpile topsoil for reclamation use. The topsoil <br />will be stripped four inches deep or to the maximum <br />depth available. The gravel will then be excavated and <br />processed. The mining will begin along the east side <br />and proceed westerly. The depth of the excavation will <br />be approximately 15 feet. The final slopes of the pit <br /> <br />will be no steeper than 3H :1V prior to topsoil placement. <br />The drainage at the pit will drain to the east. When <br />completed, the stockpiled topsoil will be mixed with <br />peat moss and spread over the affected area for reclamation. <br />The area will be -f~ ed, seeded, and mulched according <br />to the Soil Conservation Service recommendations. <br /> <br />