My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41446
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41446
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:44:08 PM
Creation date
11/20/2007 10:47:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997032
IBM Index Class Name
Permit File
Doc Date
8/30/1999
Doc Name
VAN 4 SHAFT FN M-97-032 NEW 110 APPLICATION 2ND ADEQUACY REVIEW LETTER RECLAMATION COST ESTIMATE
From
DMG
To
INTERNATIONAL URANIUM CORP
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECLAMATION COS~MMARY coni'd <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description <br />sealing of shafts performed by backfilling, cos ts~ <br />included elsewhere <br />L. DRILL HOLE/MONITORING NELL SEALING <br />Task No.~ Task Description <br />n/a <br />N. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description <br />sh4~t 4 of 4 <br />Cast (E) <br />Subtotal (K): <br />Cost (E) <br />Subtotal (L ): <br />~ Cost (5) <br />6 ~ Break conc <br />1 ~ Demolition see itemized list <br />16 ~ Seeding of 8.4 ac per plan <br />Fencing <br />15.17 ~ Mob/Demob equipmt/trucks from Na turita <br />Subtotal (M ): <br />5435 <br />529,931 <br />52,036 <br />54,888 <br />537,290 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 551,948 <br />II .~IND IRECT COSTS <br />A. CON TRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Cost (E) <br />___ <br />________I <br />1. ~ ___________________..______________ <br />Public Liability Insurance.... ________ <br />1.SSOX __ <br />of ______ <br />dir. ~ ________ <br />5805 <br />2. ~ Contractor's Performance Bond 1.550% of dir. ~ 5805 <br />3. ~ Contractor's Profit........... 10.OOX of dir. ~ 55,195 <br />4. ~ Job Superintendent.. <br />Subtotal (A): Eb, 805 <br />________ ___ <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 558,753 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.~ Item Description ~ Cost (E) <br />________I______________________________________________________________ <br />1. Minerals Program Adm ~ 5.007. of cntr. $2,938 <br />NET INDIRECT COST PERCENTAGE: 18.76% Subtotal (B): 52,938 <br /> <br />TOTAL INDIRECT RECLAMATION __________ <br />COSTS (su6t otals __ <br />A through B): __________ <br />E9, 743 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 561,691 <br />
The URL can be used to link to this page
Your browser does not support the video tag.