Laserfiche WebLink
<br />ROADABLE EOUI PMENT: <br />------------------ Total Eqp. Fleet Size Haul Trip Return Trip <br />Machine Description <br />_________ <br />______________ <br />_ Cost/hr (no. hauled) Cost/hr Cost/hr <br />____ <br />_ <br />___ <br />Truck, end dump, 72 yd __________________________ <br />E19.20 ________________________________ <br />3 E57.60 _____________ <br />E57.60 <br />Welding truck E15.00 1 E15.00 E15.00 <br />- -------- -------------------------------------------- <br />Subtotals E72.60 E72.60 <br />MOB/DEMOB SUPPORT EDUIPMENT: _________ _-_______ <br />sheet 2 of 2 <br />--------------------------- Weight Ownership Haul Rig Fl eec Sixe Haul Trip Return Trip DOT Permit <br />Non-Roadable Eqp. Description (tons) Cost/hr Cost/hr (no. hauled) Cost/hr Cost/hr Cost/ea <br />__________ _ ______________________________________________________ <br />Subtotals E0.00 E0.00 E0.00 <br />Total Eqp. Fleet Size Haul Trip Return Trip <br />Roadable Eqp. Description Cost/hr (no. hauled) Lost/hr Cost/hr <br />Subtotals E0.00 E0.00 <br />EQUIPMENT HAUL DISTANCE 8 TIME <br />Nearest major city or town within project area region: Naturita LO <br />Total one way travel distance = 20.0 miles. Average [ravel speed = 30.00 mph. <br />______ <br />Job Time - Non Roadable Equip.= 1.00 <br />hours ____ <br />load Roadable Equip.= _________ <br />N/A <br />hours <br />load <br />0.67 hours haul 0.67 hours haul <br />7.00 hours unload N/A hours unload <br />0.67 hours return 0.67 hours return <br />JOB COST <br />Total Mob/Demob Cost = 84,086.93 <br />NOTE: Non-roadable equipment (haul rig required to transport) mob/demob costs based on 2 round trips, each trip <br />consisting of a one-way loaded haul and a one-way empty return. Roadable equipment (no haul rig required) <br />costs based on one round trip. Colorado DOT requires special permits for oversize equipment on certain <br />specified road segments within the State. Separate permits are required for each rig on each loaded trip. <br />Additionally, pilot cars (one or two per rig depending on degree of oversize) are also required for oversize <br />equipment hauling, and loading/unloading times must be increased substantially for equi Anent which must be <br />partially dismantled for transport and re-assembled at the jab site. Costs for lifting equipment and other <br />support equipment needed for this work should be included in the mob/demob costs. <br /> <br />