Laserfiche WebLink
TrucklLoader Team Work~t'd Task # : 002 • sheet 2 of 2 <br />Loading Tool Cvcle Time : Number of tootling tool passes required to fll truck : 4 passes <br />Excavators and front shovels -machine cycle time vs. job condition rating : NA <br />-selected value within basic rating : NA <br />Track loaders -material descr.: NA <br />-cycle lime elements (min.) : Load : NA Maneuver : NA Dump : 0.700 <br />Wheel and track loaders -unadjusted basic cycle time (load, maneuver, and dump) : 0.525 minutes <br />Cycle Time Factors Loading Condition Description Factor (min.) Source <br />Material : Material 3/4'to 6' diameter 0.000 (Cat HB) <br />Stockpile : No adjustment - /actor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment - /actor not applicable 0.000 (Cat HBJ <br />Operation : No adjustment -factor not applicable 0.000 (Cat HB) <br />Dump target : Small target 0.040 (Cat HBJ <br />Net cycle time adjustment <br />Adjusted basic cycle time <br />Net load time per truck (bulk of first loader pass completed during truck exchange) <br />Truck Cvcle Time <br />0.040 minutes <br />0.565 minutes <br />1.795 minutes <br />Truck exchange time: 0.50 minutes........ Adjusted for site altitude : 0.50 minutes <br />Truck load time: 1.795 minutes........ Adjusted for site altitude : 1.80 minutes <br />Truck maneuver and dump lime: 0.90 minutes........ Adjusted for site altitude : 0.90 minutes <br />Truck travel (haul & return) time : <br /> Road condition description : NA-user <br />Haul route <br />Road <br />seg. # Haul distance <br />miles Grade <br />res. (%) Rolling <br />res. (°b) Total <br />resistance (%) Speed <br />milesArour Travel lime' <br />(minutes) <br />1 0 NA-user NA-user NA-user 15 2.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return ro ute : Haul time " : 2.00 <br />1 0 NA-user NA-user NA-user 15 2.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />• rint and last segmentt an~usreE for acceleration/tleceleration Return time " <br />"time shown inclutles alLluae adjustment Total truck cycle time <br />Loading tool unit production : 411.76 LCY/hour...... Adjusted for job efficiency <br />Truck unit production : 131.34 LCY/hour...... Atljustetl for job efficiency <br />Optimal no. tmcks/loading tool : 3 trucks........... Selected no. truckslloader <br />Adjusted hourly truck team production <br />Adjusted hourly single trucWloader team production <br />Adjusted hourly multiple trucWloader team production <br />minutes <br />2.00 minutes <br />7.20 minutes <br />341.76 LCY/hour <br />109.01 LCY/hour <br />3 trucks <br />327.04 LCYlhr <br />327.04 LCY/hr <br />327.04 LCY/hr <br />J08 TIME AND COST <br />Fleet size : 1 Team(s) Total job time : 3.67 Hours <br />Unit cost : $0.821 lLGY Total job cost: $985 <br />