My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1999-12-19_PERMIT FILE - M1999120
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1999120
>
1999-12-19_PERMIT FILE - M1999120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2021 9:55:43 AM
Creation date
11/20/2007 10:43:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999120
IBM Index Class Name
Permit File
Doc Date
12/19/1999
Doc Name
SUBSTITUTE SUPPLY PLAN FT LUPTON SAND & GRAVEL MINE OWNED & OPERATED BY L G EVERIST INC
From
BANKS & GESSO LLC
To
STATE ENGINEER
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 � s <br /> i � Table 5 <br /> Total Replacement <br /> Ft. Lupton Sand and Gravel Mine <br /> Month Actual Actual Lagged Mining Mining Lagged Net Recharge <br /> CU CU Recharge Depl. Depl. Mining Depl. Depl./Surplus <br /> 800 ft <br /> (ac'ft) (gpm) (ac•ft) (ac'ft) (gpm) (ac•ft) (ac'ft) <br /> Column-> to b 2 3a b 4 5 <br /> Jan 0.00 0.00 0.95 0.63 4.73 1.46 -0.51 <br /> ' Feb 0,00 0,00 0.69 1.17 8.79 1.37 -0.68 <br /> Mar 0.00 0.00 0.50 1.75 13.14 1.57 -1.06 <br /> Apr 0.48 3.57 0.52 2.82 21.18 2.04 -1.51 <br /> May 2.11 15.86 1.10 3.20 24.03 2.49 -1.39 <br /> Jun 6.61 49.61 3.04 4.24 31.84 3.08 -0.05 <br /> Jul 10.51 78,95 5.79 4.55 34.17 3.62 2.16 <br /> Aug 7.55 56,73 6.55 3.73 28.01 3.65 2.89 <br /> Sept 2.50 18,75 4.88 2.83 21.25 3.31 1.57 <br /> Oct 0.08 0,63 2.92 1.94 14.57 2.79 0.13 <br /> Nov 0.00 0.00 1.85 1.35 10.14 2.27 -0.43 <br /> ' Dec 0.00 0,00 1.32 1.04 7.81 1.86 -0.54 <br /> Sub-Total 29.84 224,09 30.11 29.25 219.67 29.52 0.59 <br /> Jan 0.00 0.00 1.36 0.85 6.38 2.08 -0.72 <br /> Feb 0.00 0.00 0.99 1.72 12.92 1.96 -0.98 <br /> Mar 0.00 0.00 0.72 2.61 19.60 2.28 -1.56 <br /> ' Apr 0.68 5.10 0.75 4.21 31.62 3.00 -2.25 <br /> May 3.02 22,66 1.57 4.73 35.52 3.68 -2.11 <br /> Jun 9.44 70.86 4.34 6.14 46.11 4.51 -0.17 <br /> Jul 15.02 112.79 8.27 6.57 49.34 5.26 3.01 <br /> ' Aug 10.79 61.04 9.35 5.32 39.95 5.27 4.08 <br /> Sept 357 26.78 6.99 4.09 30.72 4.77 2.22 <br /> Oct 0.12 0,90 4.17 2.81 21.10 4.04 0.13 <br /> Nov 0.00 0.00 2.64 1.70 12.77 3.21 -0.57 <br /> Dec 0.00 0.00 1.86 1.54 11.57 2.63 -0.74 <br /> Sud-Total 42.631 320.141 43.021 42.291 317.601 42.68 0.34 <br /> ' Total 1 72.471 544.231 73.12 71-541 537.271 72.201 0.92 <br /> Column 1 Actual CU =Actual CU, pro-rated for dry-up (Table 4, Row 4). <br /> ' ' 1st year=25%of Total acreage,2nd year=35%of Total acreage. <br /> 2 Lagged Recharge = Calc. Replacement from Glover. <br /> 3 Mining Depl. = Net Depl. (Table 2, Col. 7). <br /> 4 Lagged Mining Depl. = Calc. Replacement from Glover. <br /> ' 5 Net Recharge (depl./surplus) = Recharge(Col. 2)- Lagged Mining Delp. (Col. 4). <br />
The URL can be used to link to this page
Your browser does not support the video tag.