Laserfiche WebLink
<br />EXHIB IT "H" <br /> <br />Since our eventual mining plan is to leave the slope in terraces, t3~e <br />additional cost of the reclamation plan would be to place and spread <br />the fine material, fertilize and seed. We have a quotation of $390..00 <br />per acre for fertilizing, seeding and mulching. This would consist of <br />the following per acre: <br />5 pounds Western Wheat Grass <br />5 pounds Intermediate Grass <br />5 pounds Russian Wild Rye <br />3 pounds White Dutch Clover <br />10 pounds Streambank Lfieat Grass <br />50 pounds Nitrogen (available) <br />a <br />250 pounds Super Phosphate <br />1.5 tons Mulching Hay <br />The cost of placing and spreading the fine material to a depth of <br />~ ~,irwti• IS''~°1' <br />12" _ ,150 Cu. Yds. per acre at an estimated cost of 20~ per Cu,,.Y<l. <br />or $430.00 per acre. Since a considerable amount of this work, however, <br />will be accomplished during the processing and mining of the aggregate, <br />it should not be considered as an actual cost but subsidiary to the min- <br />ing operation. We are estimating cost per acre of $800.00 for reclamation. <br />~. <br />,. <br />