Laserfiche WebLink
Additional information can be obtained from the calculation sheets and E=xhibits "7-7", • ~ <br />"7-12" and "7-13". <br />Pond No. 004 Bypass Ditch <br />Exhibits "7-7" and "7-13a" show the location of the bypass ditch as stated earlier. The <br />ditch allows for drainge that flows across undisturbed land to bypass the sediment pond. <br />In order to keep the velocities down and the disturbance to a minimum, the ditch changes <br />slope three times as does The ditch design. The placement of riprap at grade change <br />should keep erosional problems minimal. <br />Please refer to ditch calculation sheet(s) for specific design. <br />• <br /> <br /> <br />7-6-2a-3 <br />Revised 8-27-82 <br />