Laserfiche WebLink
.. <br />ESTIMATING FORM - REVEGETATION YORK cont'd Filename M008-4 sheet 2 of 2 <br />B. SHRUB 8 TREE TRANSPLANTS <br />____________________________ ~ ~ MATERIAL: PLANTING: ~ f/PERT. ~ TOTAL ~ TOTAL <br />SPECIES NAME ~ OUAN./ACRE ~ STOCK TYPE 8 SIZE ~ S/PLANT I E/PLANT ~ PELLET ~ 5/PLANT ~ f/ACRE <br />Rubber rebbitbrush ~ 15 ~ Tubling... 10-13 cu.in. ~ 50.72 ~ 50.60 ~ 41.74 ~ 53.06 ~ 545.90 <br /> Total transplant cost/acre: 545.90 <br />C. SEEDBED PREPARATION =___________ <br />Tilling method #t: disc harrowing •• <br />#2: <br />D. SEED APPLICATION <br />____________________ <br />_ _ <br />Seeding method: drill seeding <br />MULCH / NETTING / OTHER MATERIALS <br />E. FERTIL121 NC <br />_______________ FERTILIZER / SOIL AMENDMENT <br />_ ~ UNITS/ACRE <br />__===== ~ UNIT <br />========== ~ 5/UNIT ~ <br />===== <br />°_~ f/ACRE <br />______________________ <br />__________________ <br />Materials used #1: 10-34-0, 18-46-0, 5-10-5 ________~_____ <br />~ 89.00 <br />~ pound 1 <br />__ <br />__ <br />~ 50.20 ~ ___________ <br />517.80 <br />#2: triple superphosphate (0-46-0) • ~ 89.00 ~ pound ~ f0.29 ~ !25.81 <br />#3: muriete of potash (0-0-60) • ~ 65.00 ~ pound ~ 50.20 ~ 513.00 <br /> Total materiels cost/acre: 556.61 <br />Application method #1: hand held broadcast spreader • <br />#2: <br />F. MULCHING <br />Materials used #1: hey (delivered) - ton <br />#2: <br />#3: <br />#4: <br />Application method #1: crimping (with tractor) <br />#2: <br />#3: <br />G. JOB COST <br />Total area to be seeded: <br />Estimated failure rate: <br />f96.80 <br />Total cost/acre: 596.80 <br />____________ <br />Total cost/acre: 560.23 <br />!701.63 <br />Total application cost/acre: 5101.63 <br />UNITS/ACRE ~ UNIT ~ S/UNIT ~ S/ACRE <br />2.00 ~ ton ~ 5106.65 ~ 5213.30 <br />Total materials cost/acre: 5213.30 <br />-----541.41 <br />Total application cost/acre: (41.41 <br />8.69 acres. Total E/acre <br />SO.OOX of area. Total E/acre• <br />• Reseeding cost items: A B D E F <br />fb86.76 Total Initial Job Cost= f5, 707.25 <br />5559.96 Total Reseeding Costs = 52,433.03 <br />GRAND TOTAL JOB COST = E8, 140.27 <br />