My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE41099
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE41099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:43:53 PM
Creation date
11/20/2007 10:38:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996008
IBM Index Class Name
Permit File
Doc Name
ESTIMATING FORM BULLDOZIER WORK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />COLORADO DIVIS]ON OF MINERALS AND GEOLOGY <br />D02ER COST 8 PERFORMANCE DATA WORKSHEET <br />Machine Make 8 Model: Lat D8N <br />Dozer Blade: UNIVERSAL <br />Attachment #1: ROPS Cab <br />Attachment #2: 1-shank ripper <br />Lest Cost Revision: April, 1995 <br />BASE EQUIPMENT COSTS (CRG) <br />sheet 1 of 2 sheets <br />REFERENCES: 1) Cost Reference Guide (CRG) <br />2) Contractors Equipment Cost Guide (CECG) <br />3) Colorado Contractors Association <br />Wage Rate Schedule <br />4) Caterpillar Performance Handbook <br />~----------- Base Ownership 8 Overhaul Costs ------------~ -----------••-• Base Operating Costs ------- -•-•--- <br />Ownership ~ Overhaul ~ Field Repair <br />Depreciation CFC Overhead ~ labor Pa rts~ Labor Parts ~ Fuel Lube Tires G.E.C. <br />__________________________________________ <br />Machine 517.05 ____________ <br />E8.86 ______________ <br />E6.52 ______ <br />54.63 ________ <br />211.63 ________ <br />E5.14 _______ <br />E9.35 _______________ <br />E9.91 _______ <br />53.25 _______ <br />50.00 _______ <br />51.56 <br />Attachment #1 f0.00 20.00 E0.00 E0.00 E0.00 E0.00 50.00 20.00 50.00 f0.00 50.00 <br />Attachment #2 f0.00 E0.00 E0.00 E0.00 E0.00 E0.00 E0.00 E0.00 E0.00 E0.00 50.00 <br />COST ADJUSTMENT FACTORS (CECG) <br /> ACQUISITION COST BREAKDONN <br />Factor Description <br />_________________________ Base Value <br />_______ Adj. Value <br />___ Multiplier <br />__________ ~ <br />_ Cost Elements (CECG) <br />- <br />------------ Factor <br />_-____- Adj. Cost <br />-------- <br />Acquisition cost: _________ <br />f358,560.00 ___________ <br />f288, 882.83 0.806 I <br />~ ---_---__. <br />- <br />Base purchase price _ ...- <br />f358, 560.00 <br />Econ. life hrs.-machine: 13,245 10,455 1.267 ~ Less dealer discount 0.100 535,856.00 <br />-attach. #1: 11,000 11,000 1.000 ~ PLus freight 0.020 f7, 171.20 <br />-attach. #2: N/A N/A 1.000 ~ Plus dealer charges* 0.005 E1, 792.80 <br />Annual use hours: 2,112 1,525 1.385 ~ •MLRD estimate ------------ <br />Mechanic's labor cost: 527.15 f23.32 0.859 ~ pdj us led purchase price E331, 668.00 <br />Fuel cos[/gal.-gasoline: 51.15 51.15 1.000 ~ Plus [axes: Sales a 3X E9, 950.04 <br />-diesel: 50.94 50.94 1.000 ~ SMM a2X fb, 633.36 <br />Cube cost: E3.25 53.25 1.000 ~ Less lire cost 50.00 <br />Tire life hours: 0 0 1.000 ~ Less salvage vaf ue 0.179 f59, 368.57 <br />Tire factor: 0 0 1.000 ~ ------------ <br />Tire cost: 50.00 20.00 1.000 ~ Net acquisi [i on cost 5288,882.83 <br />ADJUSTED EOUI PMENT COSTS <br /> <br />_________________________ <br />_________________________ ---------- Adjusted Ownership <br />______________________________ <br />______________________________ 8 Overhaul <br />___________ <br />___________ Costs ---------~-----•------- Adjusted Operating Costs ------ <br />_____________________________________________________________ <br />_____________________________________________________________ ------ <br />______ <br />______ <br />Acquisition cost E13.74 N/A N/A N/A N/A N/A N/A N/p N/A N/A N/A <br />Econ.life -Dozer 8 ROPS 217.40 ,N/A N/A E5.87 E14.73 E6.51 511.85 N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A 50.00 20.00 20.00 50.00 N/A N/A N/A N/A <br />Annual usage 219.02 512.27 E9.03 N/A N/A N/A N/A N/A N/A N/A N/A <br />Double shifts 514.27 fb. 14 f4.51 N/A N/A N/A N/A N/A N/A N/A N/A <br />Triple shifts 212.69 24.09 f3.01 N/A N/A N/A N/A N/A N/A N/A N/A <br />Mech.labor-Dozer 8 ROPS N/A N/A N/A E5.04 N/A 25.59 N/A N/A N/A N/A N/A <br />-Attach. #2 N/A N/A N/A E0.00 N/A E0.00 N/A N/A N/A N/A N/A <br />Fuel/lube -Dozer 8 ROPS N/A N/A N/A N/A N/A N/A N/A 59.91 53.25 E0.00 51.56 <br />-Attach. #2 N/A N/A N/A N/A N/A N/A N/A 20.00 f0.00 f0.00 E0.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.