Laserfiche WebLink
. .. - <br />ESTIMATING FORM - REVEGETATION NORK eont'd <br />8. SHRUB 8 TREE TRANSPLANTS <br />____________________________ ~ ~ MATERIAL: PLANTING: ~ 5/PERT. ~ TOTAL ~ TOTAL <br />SPECIES NAME ~ OUAN./ACRE ~ STOCK TYPE 8 SIZE ~ E/PLANT ~ E/PLANT ~ PELLET ~ S/PLANT ~ E/ACRE <br />Rubber rabbitbrush ~ 15 ~ Tubling... 10-13 cu.in. ~ E0.72 ~ E0,60 ~ E1.74 ~ E3.06 ~ E45.90 <br /> Total transplant cost/acre: 545.90 <br />C. SEEDBED PREPARATION = ___=_______ <br />Tilling method #1: disc harrowing •* <br />#2: <br />D. SEED APPLICATION <br />Seeding method: drill seeding <br />Filename M008-4 sheet 2 of 2 <br />596.80 <br />Total cost/acre: 596.80 <br />____________ <br />Total cost/acre: 560.23 <br />E. FERTILIZING <br />_______________ FERTILIZER / SOIL AMENDMENT UNITS/ACRE ~ UNIT ~ S/UNIT ~ S/ACRE <br />Materiels used #1: 10-34-0, 18-46-0, 5-[0-5 • ~ 89.00 ~ pound ~ 50.20 ~ f17.80 <br />#2: triple superphosphate (0-46-0) * ~ 89.00 ~ pound ~ 50.29 ~ 525.81 <br />#3: muriate of potash (0-0-60) * ~ 65.00 ~ pound ~ 50.20 ~ 513.00 <br /> Total materials cost/acre: E56.61 <br />Application method #1: hand held broadcast spreader * 5101.63 <br />#2: <br /> Total application cost/acre: 5101.63 <br />F. MULCHING =___=_______ <br /> MULCH / NETTING / OTHER MATERIALS ~ UNITS/ACRE ~ UNIT ~ E/UNIT ~ S/ACRE <br />Materials used #1: hey (delivered) - ton • ~ 2.00 ~ ton ~ f106.65 ~ 5213.30 <br />#2: <br />#3: <br />#4: <br /> Total materials cost/acre: E213.30 <br />Application method #1: crimping (with tractor) * 541.47 <br />#2: <br />#3: <br />G. JOB COST <br />Total area to be seeded: 8.69 acres. <br />Total E/acre <br />Total application cost/acre: E41.41 <br />Estimated failure rate: SO.OOX of area. Total E/ac re• <br />• Reseeding cost items: A B D E F <br />5656.76 Total Initial Job Cost= 55,707.25 <br />_________ ____________ <br />_________ ____________ <br />E559,96 Total Reseeding Costs = E2,433.03 <br />GRAND TOTAL JOB COST = 58,140.27 <br />